Similar Projects
Parking Lot Drainage Repair
Infrastructure
Bidding
$25,000 est. value
Boise, ID 83702

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

Culvert Replacement
Infrastructure
Post-Bid
Nampa, ID 83687

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

Desmet Road Pedestrian Trail Project
Alteration
Post-Bid
Plummer, ID

Constructing a Stiff Leg Culvert on SH-21 MP 123
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
ID

Little Sand Creek Discharge Pond Cleaning Services
Infrastructure
Post-Bid
Sandpoint, ID 83864

Roads and Bridges
Alteration
Results
$1,000,000 to $2,500,000 est. value
ID

Replace / Install Parking Lot Drains, Idaho State Veterans Home
Infrastructure
Post-Bid
$321,500 est. value
Pocatello, ID 83201

Pipe and Guardrail Replacement
Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Alturas Water System Improvement & Cabin Creek Drainage Restoration Project On The Sawtooth National Forest
Term Contract
Results
$250,000 to $500,000 est. value
Stanley, ID 83278

Esther Simplot Pond Outlet
Infrastructure
Results
$375,000 est. value
Boise, ID 83702

Widen the Roadway to a Two-lane Urban Road With Bicycle Lanes, Turn Lanes, Storm Drainage Improvements
Infrastructure
Results
ID

Tom Beall Road Slide Repair
Infrastructure
Results
Lapwai, ID 83540

Reported 07/19/2022 12:00 AM
Project Title

Coeur d'Alene Riverbank Stabilization Project

Physical Address View project details and contacts
City, State (County) Avery, ID   (Shoshone County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

The KSSWCD is requesting bids for a riverbank stabilization project on the Coeur d'Alene river, Shoshone County, Idaho. The restoration plan aims to restore approximately 1645 feet of streambank ranging 6- 12 feet in height. These streambanks likely contain highly contaminated soils, which are present from historical mining in the Silver Valley. Treatments vary along the project site depending on bank height, river flow, and landowner preferences, but will include vegetated riprap, bank barbs, and vegetative bank plantings.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents