Similar Projects
Fire Station #13 - C012 - City of Aurora
New Construction, Infrastructure
Conception
$7,091,600 CJ est. value
Aurora, IL 60502

The Streams Dredging Project - City of Wheaton
Infrastructure
Conception
$850,000 CJ est. value
Wheaton, IL 60187

Blanchard Circle Mixed Use Buildings
New Construction, Infrastructure - 16,400 SF
Design
$4,000,000 CJ est. value
Wheaton, IL 60189

Poplar Creek Church Bartlett
New Construction, Infrastructure
Design
$1,800,000 CJ est. value
Bartlett, IL 60103

Emergency Communications Tower Construction
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Downers Grove, IL 60515

Drainage Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Waukegan, IL 60085

2022 Site Improvements
Infrastructure
Results
Willowbrook, IL 60527

Noise Abatement Wall Repairs - Rebid
Infrastructure
Results
$2,068,765 CJ est. value
Downers Grove, IL 60515

Tri-State Tollway (I-294) Roadway and Bridge Reconstruction
Infrastructure
Construction
$205,907,075 CJ est. value
Hinsdale, IL 60521

Tri-State Tollway (I-294) Roadway and Bridge Reconstruction
Infrastructure
Construction
$205,907,075 CJ est. value
Hinsdale, IL 60521

Lexington Trace Parcel Unit 3 Townhomes
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Naperville, IL 60540

Lexington Trace Parcel Unit 3 Townhomes
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Naperville, IL 60540

St James Farm Near Warrenville - DuPage County
Infrastructure
Conception
$300,000 CJ est. value
Warrenville, IL 60555

Downtown Washington Street Bridge Rehabilitation - BR031- City of Naperville
Infrastructure, Renovation
Design
$3,125,000 CJ est. value
Naperville, IL 60540

Elgin O'hare Western Access Tollway (I-490) Railroad Bridge Construction, Union Pacific Railroad Over Grand Avenue East of Tri-State Tollway (I-294)
New Construction, Infrastructure
Post-Bid
$20,812,779 CJ est. value
Gurnee, IL 60031

Last Updated 08/12/2023 08:31 AM
Project Title

Installation of New Fiber Optic Cable, Network Switches, PTZ Cameras, at 77 Signalized Intersections

Physical Address View project details and contacts
City, State (County) Wheaton, IL 60189   (DuPage County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $3,706,914 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new fiber optic cable, network switches, PTZ cameras, at 77 signalized intersections. This project located in Cook and DuPage Counties. Region 1 District 1 Federal Project # CMAQNTN2(146) County(S) DuPage Cook Key Route(S) Various Marked Route(S) Section(S) 2023 TRAFFIC 03 State Job #(S) C-91-247-22 Pps #(S) 1-80252-2000 90 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 243 - Installation of New Fiber Optic Cable, Network Switches, PTZ Cameras, at 77 Signalized Intersections

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents