Similar Projects
Last Updated | 07/24/2023 05:06 PM |
Project Title | Nantucket Elementary School Replace Flooring In Five Classrooms |
Physical Address | View project details and contacts |
City, State (County) | Nantucket, MA 02554 (Nantucket County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $85,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove carpeting and install rubber tile flooring in five classrooms. bids for the supply of all labor, material and equipment necessary to replace the flooring in five (5) classrooms Questions concerning this IFB must be submitted in writing to: Diane A. O'Neil, Director of Facilities & Grounds, 10 Surfside Road, Nantucket MA 02554 before 11:00 AM, May 24, 2023 Questions may be delivered, mailed, emailed (oneild@npsk.org) or faxed The Nantucket Public Schools, through its School Committee invites qualified bidders to submit bids for the supply of all labor, material and equipment necessary to replace the flooring in five (5) classrooms (A1, A2, A3, A4, A5). To make an appointment to view the space and measure the areas please call Chip Clunie 508-228-7290 EXT 2147. This work must be done between July 1, 2023, and August 18, 2023. Contractor shall supply all labor, material, and equipment necessary to perform services in a workmanlike manner in accordance with all standard industry practices and properly dispose of all accumulated debris for the removal of carpeting and cove base and replace with ROPPE rubber tile exactly as shown in the photo below. This work willbe done in five (5) classrooms, A1, A2, A3, A4, A5. The substrate willbe prepped in accordance withmanufacturer's recommendations and standard practices for this type of demolition & installation. All cove-base will be replaced in all rooms tomatch adjacent rooms. Scope of Work: o Demo - Remove all existing carpeting and any mastic, glues and/or residue to reveal a clean and level substrate. o Demo - All cove-base. o Prepare all surfaces to accept new materials. Skim-coat/patch if necessary. o Install new ROPPE rubber tile in accordance with manufacturer's recommendations. o Install new cove-base (to match) according to manufacturer's recommendations. o The contractor is responsible for all permitting, cleanup, and proper disposal of all materials Each roomis approximately 870 square feet. Measurements of each space are the sole responsibility of the contractor. Complete clean-up of the site and disposal of allmaterials removed, and debris is the responsibility of the contractor and should be included in the bid. The contractor is NOT to use the school dumpster for any reason. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |