Similar Projects
The Spargo at Oxford Commons
New Construction, Infrastructure - 25,000 SF
Design
$6,000,000 CJ est. value
Oxford, MS 38655

Blue Water Beach
Demolition, New Construction, Infrastructure
Design
$410,000,000 CJ est. value
Diberville, MS 39540

Clock Tower (Rebid)
New Construction, Infrastructure
Post-Bid
$2,034,805 CJ est. value
Winona, MS 38967

Clock Tower (Rebid)
New Construction, Infrastructure
Post-Bid
$2,034,805 CJ est. value
Winona, MS 38967

George Regional Health Systems Multi-Specialty Complex
New Construction, Infrastructure
Results
$2,922,000 CJ est. value
Lucedale, MS 39452

Bridge Repairs on Mississippian Railway at Reeds Creek
New Construction, Infrastructure
Results
MS

2021 Wastewater Improvements
Renovation, Infrastructure
Construction
$338,600 CJ est. value
Hickory, MS 39332

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

Street Paving
Infrastructure
Design
$200,000 CJ est. value
Como, MS 38619

Phase 1 Historical Rehabilitation, Wechsler School 1951 Addition
Addition, Demolition, Infrastructure
Post-Bid
$700,000 CJ est. value
Meridian, MS 39301

Loyd Star Attendance Center Drainage and Grading Improvements
Infrastructure
Results
Wesson, MS 39191

Add Alternate Water Distribution System
Infrastructure
Design
$1,000,000 CJ est. value
Jackson, MS 39232

Pearl River Community College Aviation Aerospace Workforce Academy
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Kiln, MS 39556

Piling Repair - Bridge 171 Caledonia Road
Renovation, Infrastructure
Results
Hamilton, MS 39746

Newell Field Renovations Rebid
Infrastructure
Post-Bid
$50,000 CJ est. value
Jackson, MS 39202

Last Updated 08/11/2023 08:38 AM
Project Title

Construction of Bridge and Approaches on Fentress-Panhandle Road

Physical Address View project details and contacts
City, State (County) Weir, MS 39772   (Choctaw County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All bids so received will be publicly opened and read aloud. The work shall consist essentially of the following items: Construction of a new prestressed concrete bridge and paved roadway approaches to replace an existing bridge on Fentress-Panhandle Road over Tibby Creek. Contract Time: 120 Working Days The above general outline of features of the work does not in any way limit the responsibility of the contractor to perform all work and furnish all plant, labor, equipment, and materials required by the specifications and the drawings referred to therein. The attention of bidders is directed to the Contract Provisions governing selection and employment of labor. Minimum wage rates for Federal-Aid projects have been predetermined by the Secretary of Labor and are subject to Public Law 87-581 Work Hours Act of 1962, as set forth in the Contract Provisions. The Board of Supervisors of Choctaw County hereby notifies all Bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged and women's business enterprises will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, age, disability, religion or national origin in consideration for an award. The award of this contract will be contingent upon the Contractor satisfying the DBE requirements. Each bid shall be accompanied by a Cashier's check, Certified Check on a solvent bank or a Bidder's Bond issued by a Surety Company licensed to operate in the State of Mississippi, in the amount of five percent (5%) of the total bid price, payable to the Choctaw County Board of Supervisors as bid security. The successful bidder will be required to furnish a Performance Bond and a Payment bond each in the amount of one hundred percent (100%) of the contract amount. The proposal and contract documents in its entirety shall be submitted in a sealed envelope and deposited with the Chancery Clerk, 22 E. Quinn Street, P.O. Box 250, Ackerman, Mississippi 39735 prior to the hour and date above designated. Work to be performed shall be in accordance with the "Standard Specifications for State Aid Road and Bridge Construction, 2004 Edition", together with all amendments and/or special provisions and/or addenda to the standards duly approved and adopted, unless otherwise noted in these specifications. The attention of Bidders is directed to the provisions of Subsection 102.07 pertaining to irregular proposals and rejection of bids

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents