Similar Projects
Convenience Store With Fuel Station
New Construction
Conception
Fort Collins, CO 80524

Dellenbach Subaru Minor Vehicle Repair
Renovation - 24,000 SF
Conception
Fort Collins, CO 80525

Flats at Hansen Farm
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Fort Collins, CO 80528

Flats at Hansen Farm
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Fort Collins, CO 80528

Kinston Millennium East 15th and 16th Subdivision
Infrastructure
Post-Bid
Loveland, CO

2 Mazda - Loveland
New Construction
Post-Bid
Loveland, CO 80538

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

The Ranch - Arena Circle Relocation and Andalusian Road
Infrastructure
Results
Loveland, CO

Buc-ee’s Travel Center #60
New Construction - 74,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Johnstown, CO

Buc-ee’s Travel Center #60
New Construction - 74,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Johnstown, CO

Worthington Storage
New Construction, Infrastructure - 85,200 SF
Pending Verification
$9,200,000 CJ est. value
Fort Collins, CO 80526

The Overland by Balfour Senior Living Development
New Construction, Infrastructure - 250,000 SF
Pending Verification
$35,000,000 CJ est. value
Fort Collins, CO 80528

Chicken Salad Chick
Build-Out - 2,500 SF
Conception
Fort Collins, CO

Enclave at Redwood
New Construction, Infrastructure
Design
$91,000,000 CJ est. value
Fort Collins, CO 80524

Safe Water Action Program General Contractor
Infrastructure
Post-Bid
Fort Collins, CO

Last Updated 05/22/2023 03:08 PM
Project Title

Prospect Ridge Mixed-Use

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80525   (Larimer County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a 4,000 square foot convenience store and gas station as well as 12,155 square foot and 9,750 square foot commercial buildings. As of May 22, 2023, this project is under preliminary design review. This will be review on May 31st, 2023. Information regarding an architect and general contractor has not been released. A firm construction timeline has not been determined; however, construction is not expected to begin before first quarter of 2024. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 25,905 SF - 12,155 SF. 4,000 SF. 9,750 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents