Similar Projects
Last Updated | 06/02/2023 09:03 AM |
Project Title | On-Call Professional Engineering Design Services at Port of Long Beach |
Physical Address | View project details and contacts |
City, State (County) | Long Beach, CA 90802 (Los Angeles County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2019 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide On-Call Professional Engineering Design Services to support the Port of Long Beach (POLB) Engineering Design Division (EDD) delivery of the Harbor Department's $2 Billion 10-year Capital Improvement Program (CIP) and infrastructure maintenance program. Services shall include engineering design through all phases of project delivery from planning to construction to project closeout. Design disciplines required include, but are not limited to civil, structural, electrical, mechanical, plumbing, geotechnical, environmental, traffic and transportation, and utility investigation.Consultant services may be authorized for tasks associated with the above listed services contingent on POLB needs, availability of Port resources, consultant performance, and funding availability. POLB anticipates entering into agreements for On-Call Professional Engineering Design Services with up to five (5) prime engineering consulting firms, each with a total not-to-exceed contract amount ranging from $3M to $5M, and a contract term of up to three (3) years. The selected firms will be required to provide the scope of services identified in "Attachment A". The scope of services may be revised during the selection and/or negotiation process.Services shall meet the applicable requirements of the Port's Guidelines for Professional Consulting Services Online Q&A Deadline: February 26,2019 4.00 PM(pacific) The method of contractor selection has not been determined at this time |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |