Similar Projects
Cambridge Senior Living
New Construction - 44,567 SF
Conception
Eau Claire, WI 54701

Outlot 15 Nine Springs
New Construction
Conception
Fitchburg, WI

Congregational Home Residence And Rehabilitation
Addition - 21,044 SF
Design
Brookfield, WI 53005

Terravessa
New Construction
Design
Fitchburg, WI

NCHC Mountview Admin & Outpatient Services
Renovation
Sub-Bidding
Wausau, WI 54403

Port Washington Assisted Living
New Construction - 27,967 SF
Post-Bid
Port Washington, WI

Villa West Green Bay
Renovation
Post-Bid
Green Bay, WI 54304

Aging and Disability Resource Center - Remodel
Renovation
Results
Sheboygan Falls, WI 53085

LaCrosse Home Tomah VA Medical Center
New Construction
Results
$250,000 to $500,000 est. value
Tomah, WI 54660

Saint Vincent De Paul Homeless Shelter
New Construction
Construction
Fond du Lac, WI 54935

River Falls Senior Living
New Construction
Pending Verification
$22,000,000 est. value
River Falls, WI 54022

Woodside Prairie Autism and Student Housing
New Construction
Pending Verification
Grafton, WI 53024

Cedar Community
Renovation
Conception
West Bend, WI 53095

Oak Park Place Elderly Facility
Addition - 11,935 SF
Design
Green Bay, WI 54311

Capital Centre West Senior Housing
Renovation - 167,159 SF
Post-Bid
Madison, WI 53703

Last Updated 04/15/2022 03:36 PM
Project Title

The Courtyard at Sussex Bid Package 2

Physical Address View project details and contacts
City, State (County) Sussex, WI 53089   (Waukesha County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method
Project Status Construction Commenced October 2020, Construction Nearing Completion, Construction Complete as of March 2022
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Facility will include 58 residential care apartments, 27 assisted living units and 25 memory care units.

Details

Assisted Living Facility, 2 Stories Above Grade, 103,822 SF New Construction, 110 Unit(s).
Division 03 - Concrete, Cast Underlayment.
Division 04 - Masonry, Masonry Fireplaces, Manufactured Stone Masonry.
Division 05 - Metals, Structural Steel Framing.
Division 06 - Wood, Plastics, and Composites, Schedules for Wood, Plastics, and Composites, Schedules for Rough Carpentry, Wood Truss Schedule, Rough Carpentry, Finish Carpentry, Architectural Wood Casework, Cabinet and Drawer Hardware.
Division 07 - Thermal and Moisture Protection, Sheet Waterproofing, Thermal Insulation, Weather Barriers, Shingles and Shakes, Siding, Fiber-Cement Siding, Protected Membrane Roofing, Thermoplastic Protected Membrane Roofing, Flashing and Sheet Metal, Roof Specialties, Manufactured Gutters and Downspouts, Roof Accessories, Applied Fireproofing, Intumescent Fireproofing, Joint Sealants.
Division 08 - Openings, Access Doors and Panels, Coiling Doors and Grilles, Overhead Coiling Doors, Plastic Windows, Vinyl Windows, Door Hardware, Glazing.
Division 09 - Finishes, Gypsum Board, Acoustical Ceilings, Acoustical Tile Ceilings, Resilient Flooring, Resilient Tile Flooring, Carpeting, Sheet Carpeting, Painting.
Division 10 - Specialties, Exterior Specialties, Flagpoles.
Division 11 - Equipment, Residential Appliances.
Division 12 - Furnishings, Countertops.
Division 21 - Fire Suppression.
Division 27 - Communications, Healthcare Communications and Monitoring Systems, Nurse Call/Code Blue Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents