Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Industrial Park Expansion (Phase I) - 5 - City of Cedar Falls
Alteration
Conception
$6,000,000 est. value
Cedar Falls, IA 50613

Seerley Park Renovation - 150 - City of Cedar Falls
Infrastructure
Design
$300,000 CJ est. value
Cedar Falls, IA 50613

Main Street Reconstruction - City of Cedar Falls
Infrastructure
Design
$12,025,000 est. value
Cedar Falls, IA 50613

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

2021 Seal Coat
Infrastructure
Results
$143,728 est. value
Cedar Falls, IA

HMA Resurfacing With Milling
Infrastructure
Results
IA

Gibson Property Development - Phase lll-V - City of Cedar Falls
New Construction, Infrastructure
Pending Verification
$1,400,000 CJ est. value
Cedar Falls, IA 50613

Union at North Crossing
New Construction, Infrastructure
Pending Verification
$68,000,000 CJ est. value
Waterloo, IA 50703

Downtown Lot Improvements - City of Cedar Falls
Infrastructure
Conception
$300,000 CJ est. value
Cedar Falls, IA 50613

Cedar River Safety and Recreational River lmprovements Phase I - City of Cedar Falls
Infrastructure
Design
$4,831,000 est. value
Cedar Falls, IA

FY 2022 Asphalt Overlay Program
Infrastructure
Post-Bid
Waterloo, IA

Cedar Falls West Viking Road Industrial Park Phase V
Addition, Infrastructure - 180,675 SF
Results
Cedar Falls, IA 50613

Aikey Auto Salvage Storage Building
New Construction, Infrastructure - 5,200 SF
Pending Verification
$560,000 CJ est. value
Waterloo, IA 50703

Reported 05/19/2023 12:00 AM
Project Title

Wood Street Reconstruction

Physical Address View project details and contacts
City, State (County) Hudson, IA 50643   (Black Hawk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction Start Expected 2023,
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include the reconstruction of Wood Street, between South Hudson Road and South Washington Street. Reconstruction includes 2,344.4 SY of 8-inch PCC paving, 82 LF of 15 Storm Sewer, 860 LF of 6 Subdrain, 534 LF of 8 Water Main, and 2 intakes with 15 Apron.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents