Similar Projects
Reported 02/12/2020 12:00 AM
Project Title

Construction for FY 18 MILCON, KELL123018, Air Traffic Control Tower, Joint Base San Antonio (JBSA) – Lackland Kelly Field Annex, Texas

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78236   (Bexar County)
Category(s) Tower/Signal System
Sub-Category(s) Tower/Signal System
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing an Air Traffic Control Tower (ATCT) with reinforced concrete pile foundation and slab floor, masonry walls and standing seam metal roof. This project includes an elevator, a catwalk surrounding the tower cab as well as utilities, site improvements, pavements, special foundations, a backup power generator and all other work necessary to provide a complete and usable facility. This project will demolish two facilities (708 SM). Facilities are designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD Antiterrorism/force protection requirements per UFC 4-010-01.

Details

Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical.
Division 31 - Earthwork, Site Clearing.
Division 33 - Utilities, Site Grounding, Site Improvements Grounding, Tower Grounding, Site Lightning Protection, Communications Utilities, Communications Structures, Communications Transmission Towers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents