Similar Projects
Reported | 02/12/2020 12:00 AM |
Project Title | Construction for FY 18 MILCON, KELL123018, Air Traffic Control Tower, Joint Base San Antonio (JBSA) – Lackland Kelly Field Annex, Texas |
Physical Address | View project details and contacts |
City, State (County) | San Antonio, TX 78236 (Bexar County) |
Category(s) | Tower/Signal System |
Sub-Category(s) | Tower/Signal System |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 to $25,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of constructing an Air Traffic Control Tower (ATCT) with reinforced concrete pile foundation and slab floor, masonry walls and standing seam metal roof. This project includes an elevator, a catwalk surrounding the tower cab as well as utilities, site improvements, pavements, special foundations, a backup power generator and all other work necessary to provide a complete and usable facility. This project will demolish two facilities (708 SM). Facilities are designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD Antiterrorism/force protection requirements per UFC 4-010-01. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |