Similar Projects
Tromley Road Reconstruction
Bidding
Windsor, CT

Repaving of Fairview Street, Lowell Road, and Warrenton Avenue
Bidding
West Hartford, CT 06119

On-Call Equipment and Labor Rates for Civil Site Work
Post-Bid
Simsbury, CT

Private Alleyway Resurfacing Project
Post-Bid
Hartford, CT 06106

Riverside Road and Drake Hill Road Pavement Rehabilitation and Bridge Repairs at Bridge No. 05637
Results
Less than $481,138 est. value
Simsbury, CT 06070

Asphalt Pavement Crack Sealing
Term Contract
Results
Hartford, CT

Cross Road Rehabilitation
Bidding
Waterford, CT

Crack Sealing of City Streets - 2020
Post-Bid
New Britain, CT

Safety and Operational Improvements on I-84
Results
$40,000,000 to $59,999,999 est. value
West Hartford, CT 06107

AASF Access Road Aircraft Apron Repairs - Phase 1 Bradley Army National Guard Base
Post-Bid
$800,000 to $1,000,000 est. value
Windsor Locks, CT 06078

Resurfacing, Bridge Rehabilitation and Safety Improvements
Results
$40,000,000 to $59,999,999 est. value
Meriden, Southington, CT 06450

CY2021 Paving of Roadways
Post-Bid
Windsor, CT

2020 Paving Program - Contract 1
Results
Manchester, CT

CY2021 Milling and Reclaiming of Roadways
Post-Bid
Windsor, CT

Roundabout on Route 10/202 at East Street and Notch Road
Results
$1,000,000 to $2,499,999 est. value
Granby, CT 06035

Reported 04/08/2021 12:00 AM
Project Title

Contractor Rate Submittal to Public Works for 2021-2023

Physical Address View project details and contacts
City, State (County) Suffield, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Local Contractors to indicate equipment and labor rates for work on road, drainage, grading, restoration, utility repair or other general contractor work (as requested by the Highway Foremen) for the period of 2021-2023 by filling in this schedule. The contractor with the lowest rates will get the first request from the Highway Foreman. If the work cannot be started in a timely manner, the next lowest rate contractor will be contacted. The Highway Foremen, at his discretion, may also employ more than one contractor (on the basis of rates) to work on two or more projects occurring at the same time.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents