Similar Projects
Memphis Waterfront Tower Mixed Use
Renovation
Conception
Memphis, TN 38103

757 Court Mixed Use
New Construction - 26,300 SF
Conception
$500,000 to $1,000,000 CJ est. value
Memphis, TN 38105

7 Vance
New Construction - 184,690 SF
Design
$47,282,374 est. value
Memphis, TN 38103

AutoZone #9801
New Construction
Design
Memphis, TN

Coleman Storage Tank Replacement
Infrastructure
Bidding
$128,000 CJ est. value
Memphis, TN 38103

East Madison Avenue Track Pavement Repair
Infrastructure
Bidding
$470,723 est. value
Memphis, TN 38104

Millington School District Central Middle High School Fence Improvements
Infrastructure
Sub-Bidding
$30,000 CJ est. value
Millington, TN 38053

Painting of Mast Arms
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Collierville, TN 38017

Kroger #426-08
Renovation
Post-Bid
Memphis, TN 38016

Concrete Replacement and Asphalt Pavement
Post-Bid
Bartlett, TN

Street Resurfacing Spring 2021
Results
Collierville, TN

FY 2021 Asphalt Paving, North Section
Results
Memphis, TN 38103

Tractor Supply #0153
Renovation - 22,672 SF
Construction
Arlington, TN 38002

Sunglass Hut
Renovation - 1,561 SF
Construction
Memphis, TN 38105

South Main Development
New Construction
Pending Verification
$23,580,000 est. value
Memphis, TN 38103

Last Updated 07/28/2022 04:32 PM
Project Title

Sissy's Log Cabin / Memphis

Physical Address View project details and contacts
City, State (County) Memphis, TN 38117   (Shelby County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the renovation of a former restaurant into a jewelry store. As of July 28, 2022, this project is in the design development phase. The architect expects to negotiate with a general contractor at the appropriate time. A firm construction timeline has not been set, however, construction is not expected to begin prior to fourth quarter 2022.

Details

9,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents