Similar Projects
Last Updated | 07/25/2023 09:01 PM |
Project Title | Electric Vehicle Charging Station Furnishing and Installation |
Physical Address | View project details and contacts |
City, State (County) | Eugene, OR 97405 (Lane County) |
Category(s) | Commercial |
Sub-Category(s) | Gas Station, Vehicle Sales/Service |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $38,441 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Nestled in the Willamette Valley, between the Cascade Mountains and the PacificOcean, Lane Community College serves more than 25,000 students per year through transfer, career technical, and personal enrichment programs. Lane Community College isseeking services from a qualified, experienced contractor to furnish and install Electric Vehicle charging stations (EVSE) at LCCs Main Campus located at 4000 East 30th Avenue, Eugene, Oregon. Provide engineered shop drawings suitable for permit Permit by contractor Provide locate services Provide excavation and backfill for conduit Pour two (2) concrete pads of 10ft x 11ft on affected sidewalks Provide and install two (2) concrete wheel stops and two (2) surface-mount steel bollards Provide as-built drawings, operation and maintenance manuals, warranty documentation, and two hours of on-site training RFQ Questions Due: May 24, 2023 - 2:00pm Lane Community College is seeking services from a qualified, experienced contractor to furnish and install Electric Vehicle charging stations (EVSE) at LCC's Main Campus located at 4000 East 30th Avenue, Eugene, Oregon. Completion Date: September 30, 2023 The college reserves the right to reject any or all proposals received as a result of this request. The college may reject any proposal not in compliance with all prescribed public procurement procedures and requirements, and may reject for good cause any or all proposals upon a finding of the college that it is in the public interest to do so. Due to Grant funding requirements the installation must be completed between June 15, 2023 -September 30, 2023 |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |