Similar Projects
$PRESS - Therapy And Wellness Center - Petry-Kuhne Company
New Construction, Infrastructure - 40,000 SF
Design
$14,500,000 CJ est. value
Monticello, IL 61856

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RR-21-4821 Pavement Repairs
Infrastructure
Results

567.5 Miles of Spraying, Approximately 2004 Acres on State Right of Way Along US 51 and Interstate Routes including interchanges
Infrastructure
Results

Goose Creek Wind / Piatt County
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Monticello, IL 61856

Goose Creek Wind / Piatt County
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Monticello, IL 61856

ILL 105 South of Cerro Gordo: 1.5" HMA Inlay for 700 FT; Ill 105 at Monticello Near 1-72 Ramps: 1.5" HMA Inlay for 1,100 FT
Infrastructure
Post-Bid
$219,174 est. value
IL

3P Policy Designed Overlay on FAS 1531 (Old IL 47) from ILL 32 to 600E W of Monticello, Piatt County
Infrastructure
Results
IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Construction of Paved Shoulders and Rumble Strips along Ch 5 from 2.5 Miles South of Deland To 1.00 Mile North if I-72 at Monticello
Infrastructure
Results
$2,000,000 est. value
IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

3P Resurfacing - Designed Overlay of Fap 721 (ILL 10) From ILL 48 at Weldon to I-72
Infrastructure
Results

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

884.93 Ft/ 0.168 Miles of Patching and Parking Improvements at the Clinton and Monticello Complex With Drainage Improvements
Infrastructure
Results
$600,000 est. value

Last Updated 04/30/2023 03:01 AM
Project Title

Sidewalk Replacement, ADA Ramps, Drainage Improvements

Physical Address View project details and contacts
City, State (County) Monticello, IL 61856   (Piatt County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $154,862 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Sidewalk replacement, ADA Ramps, Drainage improvements, on Moultsie Street from South Washington to Piatt Street and at the intersection of IL 105/Wing Street in Bement. Region 3 District 5 Federal Project # TE3H(293) County(s) Piatt Key Route(s) Various Marked Route(s) Section(s) 22-00103-00-SW(BEMENT) State Job #(s) C-95-012-23 PPS #(s) 1-0-01756-5001 VBP% 0.00 Completion Date: August 12, 2023 Plus 5 Working Days Questions not accepted as of April 18, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 094 - Sidewalk Replacement, Ada Ramps, Drainage Improvements, on Moultsie Street and at the Intersection of Il 105/wing Street Section 22-00103-00-SW (Bement) DBE (0%)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents