Similar Projects
Mission Rock - Masterplan
New Construction - 1,315,489 SF
Conception
San Francisco, CA 94137

Slauson and Wall Development
New Construction - 60,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Los Angeles, CA 90011

The Seminary at Strawberry
New Construction
Design
Mill Valley, CA 94941

Icon/Echo Towers
New Construction, Demolition - 478,500 SF
Design
$600,000,000 est. value
San Jose, CA 95113

2022 Larry Itliong Unity Park
Renovation - 93,900 SF
Bidding
$2,800,000 to $3,100,000 est. value
Delano, CA 93215

Newport Harbor High School Aquatics Upgrade Phase 1
Renovation
Bidding
$250,000 est. value
Newport Beach, CA 92663

Park: All Inclusive Playground - Emma Prusch
New Construction
Post-Bid
$2,250,001 to $2,750,000 est. value
San Jose, CA

Hatch Preschool Playground Project
New Construction
Post-Bid
Half Moon Bay, CA 94019

Tahoe Park Pool Restroom Renovation
Renovation, Infrastructure
Results
$220,570 est. value
Sacramento, CA 95820

Creekside and Meadowbrook Group Area Renovation at Vasona Lake County Park
Renovation
Results
$924,206 est. value
Los Gatos, CA 95032

The Landing at Arroyo and Vintage at Sycamore
New Construction
Construction
$114,000,000 est. value
Simi Valley, CA 93065

Mixed-Use Residential Village
New Construction
Pending Verification
San Jose, CA 95131

SCS Dublin Mixed-Use Development
New Construction - 265,000 SF
Pending Verification
$10,000,000 est. value
Dublin, CA 94568

Hill Street Townhomes
New Construction - 1,366 SF
Conception
Less than $500,000 CJ est. value
Belmont, CA 94002

Primrose Preschool
New Construction - 20,986 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Walnut Creek, CA 94598

Last Updated 05/16/2022 06:54 AM
Project Title

Historic Barn Repairs Andrew Molera State Park

Physical Address View project details and contacts
City, State (County) Big Sur, CA 93920   (Monterey County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work as follows furnish all labor, materials, tools and equipment necessary to clear the site of vegetation that is around and in contact with the structure; repair or replace inkind wall and roof framing members, including rafter tails; repair or replace inkind old growth redwood exterior vertical board siding and paint to match existing; repairs doors and windows; repair or replace in-kind the corrugated metal roof panels; repair damaged wood at interior stable stalls; re-level and infill where necessary the interior gravel floor with matching material; provide a French drain at foundation perimeter and connect to drain outlets and drain fields.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents