Project Title | Replace Switchgear at the Booster Fabrication Facility, Kennedy Space Center, FL |
Physical Address | View project details and contacts |
City, State (County) | Cape Canaveral, FL (Brevard County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $10,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The replacement of existing AFT Skirt Test Facility, L7-0251, electrical substation 1116A/B (MV Switch, transformers and secondary switchboard). The original building substation is approximately 25 years old and is obsolete. The new substation will be customized as a M-T-M (main-tie-main) configuration and will be customized to match the dimensions of the existing concrete pad and associated circuit conduits. The new substation will share a separate control panel that will contain integrated PLC controls. The replacement of existing Manufacturing Building, L6-0247, electrical substations 1114A/B & 1115A/B (MV Switch, transformers and secondary switchboard). The original building substations are approximately 25 years old and are obsolete. The new substations will be customized as a M-T-M configuration and will be customized to match the dimensions of the existing concrete pad and associated circuit conduits. The new substations will share a separate control panel that will contain integrated PLC controls. The replacement of existing Chiller Building, L6-0147, electrical substation 1113A/B (MV Switch, transformers and secondary switchboard). The original building substation is approximately 25 years old and is obsolete. The new substation will be customized as a M-T-M configuration and will be customized to match the dimensions of the existing concrete pad and associated circuit conduits. The new substationwill share a separate control panel that will have integrated PLC controls. Where used below, “removal” means selective demolition and potential storage of items removed, “replacement” means installation of new components/systems, and “reinstallation” means reuse of existing equipment removed and placed in a new configuration, as specified in contract documents to later be formally solicited. The work includes, but is not limited to, the following: Removal existing electrical equipment and Installation of new substations (switchgear/transformers/medium voltage switches), including installation of PLCs at locations inside the new substation, installation of PLC control and power wiring, installation of sensing devices, and connection to PLCs for the circuit. Existing equipment, components, assemblies, etc., that must be removed and replaced/reinstalled are known to have coatings containing or are partially comprised of asbestos, heavy metals, and/or PCBs. Abatement procedures will be required for certain construction activities. This project includes working in a fully operational facility that cannot have any significant duration of downtime without substantial coordination around launch, launch vehicle processing schedules, and testing and manufacturing related to various launch vehicles. Phasing of work around daily operations of the BFF AFT Skirt Test Facility, the Manufacturing and Chiller Building are critical to the success of the project. Daily coordination with operations personnel for outages and work in different areas will be required to keep the BFF buildings operational while performing the work specified in the contract documents. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |