Similar Projects
Main Street East Side Sidewalk (I-15 Overpass to Pacific) - City of North Salt Lake
Infrastructure
Conception
$366,200 CJ est. value
North Salt Lake, UT 84054

Main Street East Side Sidewalk (I-15 Overpass to Pacific) - City of North Salt Lake
Infrastructure
Conception
$366,200 CJ est. value
North Salt Lake, UT 84054

Burke Lane Subdivision
New Construction, Infrastructure
Design
$69,000,000 CJ est. value
Farmington, UT 84025

Townplace Suites and Monterey West
New Construction, Infrastructure - 51,000 SF
Design
$75,000,000 CJ est. value
Syracuse, UT 84075

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 200 North and 200 South Reconstruction Projects
Infrastructure
Post-Bid
$206,838 est. value
Bountiful, UT 84010

North Ogden Divide Overlay Project
Infrastructure
Results
Ogden, UT

Eaglewood Drive Street Reconstruction
Infrastructure
Results
North Salt Lake, UT 84054

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

theHIVE
New Construction, Infrastructure
Construction
$30,000,000 CJ est. value
Centerville, UT 84014

Take 5 Oil Change / Bountiful
New Construction, Infrastructure - 1,400 SF
Pending Verification
$350,000 CJ est. value
Bountiful, UT 84010

Take 5 Oil Change / Bountiful
New Construction, Infrastructure - 1,400 SF
Pending Verification
$350,000 CJ est. value
Bountiful, UT 84010

Cynthia Way And Dorthea Way - City of North Salt Lake
Infrastructure
Conception
$416,250 CJ est. value
North Salt Lake, UT 84054

Well Pump Station
Infrastructure
Design
$900,000 CJ est. value
Farmington, UT 84025

Lacey Way Waterline and Street Reconstruction
Infrastructure
Post-Bid
North Salt Lake, UT 84054

Last Updated 06/26/2023 07:20 PM
Project Title

Overlays FY 2024 Road Maintenance Project

Physical Address View project details and contacts
City, State (County) Farmington, UT 84025   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $620,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following WORK: asphalt overlaying, milling asphalt, raising and lowering manholes, valves and monuments to grade. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents..

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents