Similar Projects
Eastpointe Memorial Library Air Handling Unit Replacement
Post-Bid
Eastpointe, MI 48021

Recirculating Air in Test Cells at Detroit Arsenal, Warren, MI
Post-Bid
$1,000,000 to $5,000,000 est. value
Warren, MI

Fraser Senior Activity Center RTU Replacement Project
Results
Less than $33,210 est. value
Fraser, MI 48026

Straight Rail Vehicle Exhaust Removal System
Results
Mount Clemens, MI 48043

MERV-13 Filters
Post-Bid
Warren, MI 48089

HVAC Unit Replacements
Results
Sterling Heights, MI

USCG Replace Furnaces at CG Airsta Detroit, Mt. Clemens, MI
Post-Bid
Mount Clemens, MI

Food Warehouse Freezer Addition and Renovations Project
Renovation, Addition - 1,325 SF
Results
Clinton Township, MI

2020 Admin HVAC
Post-Bid
Warren, MI 48089

Jail Cooling Tower Replacement
Results
Less than $187,857 est. value
Mount Clemens, MI 48043

HVAC and Mechanical Products
Term Contract
Post-Bid

Heating and Cooling Systems Maintenance and Repair Contractor
Term Contract
Results
Sterling Heights, MI

HVAC Unit Replacement - USCG Station St. Clair Shores
Post-Bid
Saint Clair Shores, MI

Chiller and Liebert Climate Control Preventative Maintenance Services
Results
Utica, MI

Bid Package 7 Bi Polar Ionization
Post-Bid
Saint Clair Shores, MI

Last Updated 10/22/2021 09:21 AM
Project Title

Memorial Library HVAC Improvements

Physical Address View project details and contacts
City, State (County) Eastpointe, MI 48021   (Macomb County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing air handling unit, refrigerant piping, temperature controls, and associated air cooled condensing unit complete. The contractor will be responsible for the removal and disposal of the existing refrigerant associated with the air handling unit. Provide a new air handling unit, refrigerant piping, temperature controls, and air cooled condensing unit. The contractor will be responsible to provide a new housekeeping pad and new fencing around the air cooled condensing unit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents