Similar Projects
Asphalt Repair and Maintenance
Bidding
Less than $100,000 est. value

Roundabout/Milling and Resurfacing/Drainage Improvements
Bidding
$2,890,300 est. value
FL

Inspection, Management, and Performance of Maintenance on All Components on and along Interstate Highway I-75 in Hillsborough, Pasco, and Hernando Counties
Post-Bid

Bayou Drive Shoulder Repair
Results
FL

Resurfacing and Extension of Helicopter Drive
Results
Brooksville, FL 34601

Hurricane Drive, Michigan Avenue, Pheasant Avenue Area MSBU Paving Project
Results
Brooksville, FL 34601

Add Lanes and Rehabilitate Pavement/Drainage Improvements/Lighting
Results
Less than $4,937,867 est. value
FL

Solid Waste Facility Paving, Phase I and II
Results
Brooksville, FL 34601

Croom Road Resurfacing Project
Results
Less than $670,506 est. value
Brooksville, FL 34601

Asphalt Repair
Results
Less than $100,000 est. value

Asphalt Repairs
Results
Less than $250,000 est. value

Asphalt Repair Experience Form
Results
Less than $500,000 est. value

Olympia Road and Skyview Circle Resurfacing Project
Results
Less than $547,663 est. value
Brooksville, FL 34601

Pomp Parkway and Dusky Warbler Road Surface Treatment
Results
Less than $998,440 est. value
Brooksville, FL 34601

Emergency Roadside Assistance Service (ERAS)
Results
Less than $204,400 est. value

Last Updated 08/14/2020 10:22 AM
Project Title

Shoal Line Boulevard Repaving, Phase I

Physical Address View project details and contacts
City, State (County) Weeki Wachee, FL 34607   (Hernando County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,095,652
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project calls for milling, leveling and resurfacing an existing asphalt roadway in Hernando County. The existing roadway shall be leveled with open grade mix and repaved with a 1.5-inch lift of SP12.5 per plans and specifications. Matching of existing driveways and side street aprons will be the responsibility of the contractor. Temporary pavement markings shall be installed after asphalt installation and be followed with thermoplastic markings on cured asphalt after County approval.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents