Similar Projects
The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Transit Area Mixed Use
New Construction
Conception
Salt Lake City, UT 84111

South Cairns Development
New Construction
Design
Sandy, UT 84070

Offices on 7th
New Construction
Design
Draper, UT 84020

Concrete Vault Toilet, Concrete Flush Toilet and Concrete Flush Toilet Shower Combinaton
New Construction, Term Contract
Bidding
$630,000 est. value
Salt Lake City, UT

DFCM Construction -The Point Phase 1 Master Developer - Stage II
New Construction
Bidding
$1,000,000 est. value
Draper, UT

University of Utah Prosperity and Impact Epicenter - Elevator Package
New Construction - 280,000 SF
Sub-Bidding
$59,712,303 est. value
Salt Lake City, UT 84112

State Office Building
Renovation
Post-Bid
Less than $57,500,000 est. value
Taylorsville, UT 84129

Sportsman`s Warehouse New Corporate Office
Renovation - 10,147 SF
Post-Bid
West Jordan, UT 84047

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Western MATOC
Results
$1,000,000 to $70,000,000 est. value

Block 67
New Construction - 430,000 SF
Construction
$5,454,500 est. value
Salt Lake City, UT 84111

Kensington Tower
New Construction - 680,000 SF
Construction
$10,000,000 CJ est. value
Salt Lake City, UT 84111

SOJO Central - Building 3
New Construction - 9,585 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
South Jordan, UT 84095

Mixed Use Apartments
New Construction
Pending Verification
Salt Lake City, UT 84111

Reported 06/16/2022 06:17 AM
Project Title

Salt Lake District Office Improvements - Phase 2 Project for The Uinta-Wasatch-Cache National Forest

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84121   (Salt Lake County)
Category(s) Commercial, Government/Public
Sub-Category(s) Misc. Buildings, Office
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will consist of remodeling two existing facilities for the Salt Lake Ranger District Office. Construction includes, but is not limited to, demolition of east entrance stairs of the north building including roof, concrete and steel stairs, doors, brick veneer, lights, mailboxes, railings, landscaping, sidewalks and sod. Excavate and construct new east entry addition including concrete footings, foundations, slabs, helical piers, framing, wood accent entrance, furring, sheathing, roofing, windows, doors, hardware, face brick, composite siding, flashing, insulation, gypsum board, painting, wood stairs, railings, doors, hardware, knoxbox, ceramic tile, grilles, tongue and groove ceiling, hydraulic elevator, sump pump oil detector, ductwork, electrical service, security, fire alarm, lighting and communications. Backfill and regrade at the addition. Demolish existing finishes, walls, doors, hardware, concrete slab, cabinetry, stairs, ceilings, plumbing, HVAC equipment, ductwork, lights, electrical and communication improvements. Provide and install new wood framing, wood stairs, railings, gypsum board, ceramic tile, vinyl tile, base, carpet, casework, insulation, doors, frames, hardware, interior windows, painting, staining, finish carpentry, cabinetry, ceilings, TPO, insulation, roofing, toilets, sinks, plumbing, drinking fountains, heating and cooling equipment, fans, ductwork, registers, lights, sensors, power and communications.

Details

Misc. Buildings, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents