Similar Projects
Replacement of BR 80, Bridge Street Pedestrian Bridge Over Bush Kill, Village of Felischmanns
Bidding
NY

Red Hill Road Bridge Replacement
New Construction
Bidding
NY

Rehabilitation of Conklin Avenue Bridge over Pierce Creek (BIN 2003610) and Belden Street Bridge over Pierce Creek (BIN 2226260) PIN 9754.02
Post-Bid
Binghamton, NY 13901

Red Hill Road Bridge Replacement - Materials Only
Post-Bid
Wurtsboro, NY 12790

Rehabilitation of Windsor Bridge CR 28 Over Susquehanna River
Results
Windsor, NY 13902

Replacement of Old Route 17 (CR28) Bridge Over Oquaga Creek (Bin 3349620)
Results
Binghamton, NY 13902

Miscellaneous Bridge - Stonework
New Construction
Bidding
Binghamton, NY

Delaware County Bridge Structural Steel Preservation Project
Post-Bid
Margaretville, Roxbury, NY

2020 Scour Project for 9 Bridges throughout Region
Results
Less than $410,000 est. value

Pile Driving Installation for Two County Bridges - County Bridge No.241 and County Bridge No.404
Post-Bid
Monticello, NY

Broome County Bridge Wearing Surface and Membrane Replacement Maintenance
Results
Binghamton, NY 13902

Replacement of Colesville Road (CR 52) Bridge Over Duell Creek Town of Kirkwood
Results
Kirkwood, NY 13795

Replacement of Washington Drive Bridge Over Fuller Hollow Creek
Term Contract
Results
Vestal, NY 13850

Bridge Rehabilitation Project: NYS Route 357 over Susquehanna River
Results
Less than $1,100,000 est. value
Sidney, Unadilla, NY 13838

Replacement of Rte. 11 Bridge Over I-81 With Construction of Roundabouts at on and Off Ramp Intersections
Results
Less than $18,300,000 est. value
Dickinson, NY 12930

Last Updated 11/08/2019 08:31 AM
Project Title

Off System Bridge Rehabs: 8 Bridges in Various Locations

Physical Address View project details and contacts
City, State (County) Hancock, Liberty, Mamakating, Thompson, NY 13783 (Broome, Delaware, Sullivan Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This bridge rehabilitation project will perform work to rehabiliate 8 bridges (and paint six of those bridges) in the Towns of Sanford, Hancock, Liberty, Thompson, Mamakating, and Delaware and Village of Monticello; in Broome, Delaware, and Sullivan Counties.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents