Similar Projects
Farag Apartment Conversion
New Construction, Renovation - 3,300 SF
Conception
$500,000 to $1,000,000 CJ est. value
Richmond, VA 23220

North 29th Street Multifamily
New Construction - 4,273 SF
Conception
Richmond, VA 23223

Oak Hill East Shopping Center/ West Creek
New Construction - 36,000 SF
Design
$10,000,000 est. value
Richmond, VA 23238

Richmond Coliseum Redevelopment
New Construction, Demolition - 280,000 SF
Design
$245,000,000 est. value
Richmond, VA 23219

507E Improvements for Whole Health
Term Contract, Build-out, Infrastructure
Bidding
$100,000 CJ est. value
Richmond, VA 23249

Maymont Area Sidewalk - Phase I
Infrastructure
Bidding
$440,000 CJ est. value
Richmond, VA 23220

Better Housing Coalition Cameo House
New Construction - 76,000 SF
Post-Bid
$11,000,000 est. value
Richmond, VA

Governor's Quad Pavers
Post-Bid
Radford, VA 24141

HSIP Pedestrian Improvements at Signalized Intersections Phase 1B
Results
Richmond, VA 23221

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

East Brookland Park Apartments
New Construction
Construction
$14,000,000 est. value
Richmond, VA 23222

Main Street Apartment Building
New Construction - 4,000 SF
Construction
$9,443,796 est. value
Richmond, VA 23223

Church Hill Residential
New Construction
Pending Verification
$1,300,000 est. value
Richmond, VA 23223

Belleville Street Units
New Construction
Pending Verification
Richmond, VA 23230

Condominium And Townhouse Development
New Construction
Conception
Richmond, VA 23295

Last Updated 08/10/2022 05:31 PM
Project Title

Dabbs House Road Residences (Carter Woods Phase 3)

Physical Address View project details and contacts
City, State (County) Richmond, VA 23223   (Richmond City County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Multi-Family Homes, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $36,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of two, 3-story apartment buildings totaling 112 units. The development will also include 28, for-sale, townhome units built in cluster rows. A 6,000 square foot community building is also planned. As of August 10, 2022, the project is on indefinite hold pending financing. Movement is not expected prior to year 2023-2024.

Details

3 Stories Above Grade, Apartments, 140 Unit(s). 6,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents