Similar Projects
Replace Tilt-Over Antenna Pole
Term Contract
Post-Bid
$125,000 to $150,000 est. value
Baraboo, WI 53913

Tower Installation
Alteration
Results
Manawa, Waupaca, WI 54981

Tower Erection and Antenna Installation
Infrastructure
Post-Bid
WI

Communication Tower Replacement - DOT
Results
Less than $570,000 est. value
Black River Falls, WI

Tower Site Equipment Shelters
Post-Bid
WI

Air Traffic Control Tower (ATCT) Tower AHU at the Airport
Infrastructure
Post-Bid
Green Bay, WI 54313

New Radio Tower at Emergency Management Building
Infrastructure
Results
Fitchburg, WI 53719

NCHC Bed Tower Building Amplification System
Alteration
Post-Bid
Wausau, WI 54403

Replace RTACs and CCMs at Milwaukee Airport
Term Contract
Post-Bid
Milwaukee, WI

Broadband Tower Installations
Alteration
Results
WI

Reported 07/27/2022 12:00 AM
Project Title

Tower Site Construction - Phase 3 B-C

Physical Address View project details and contacts
City, State (County) Lancaster, WI   (Grant County)
Category(s) Tower/Signal System
Sub-Category(s) Tower/Signal System
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $480,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope of work generally consists of the construction of (4) new radio communications tower sites for Grant County, Wisconsin. Work at each site generally includes installation of towers, antennas, coax, waveguides, prefabricated precast equipment shelters, backup generator systems, ice bridges, chain link fenced compounds, site grounding systems, and other general site improvements. Tower steel, prefabricated precast equipment shelters, and generator system equipment have been previously procured by Grant County under a separate contracts. However, installation of this equipment is required under this contract. Similarly, antennas, coax and waveguides will be provided by Others but will require installation under this project. Radio equipment within the shelters is not required and will be completed by Others.

Details

Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical.
Division 31 - Earthwork, Site Clearing.
Division 33 - Utilities, Site Grounding, Site Improvements Grounding, Tower Grounding, Site Lightning Protection, Communications Utilities, Communications Structures, Communications Transmission Towers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents