Similar Projects
Prime Corner - Master Plan
New Construction - 45,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
West Palm Beach, FL 33401

Coconut Palm Plaza
New Construction - 42,661 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
West Palm Beach, FL 33412

Groves Town Center - Master Plan
New Construction - 39,609 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Loxahatchee, FL 33470

BJ's Wholesale
New Construction - 103,596 SF
Design
$8,615,000 est. value
West Palm Beach, FL 33401

7-Eleven #41361
New Construction, Build-Out - 4,300 SF
Sub-Bidding
$1,200,000 est. value
Lake Worth, FL 33461

7-Eleven # 37721
New Construction, Demolition - 3,000 SF
Post-Bid
$1,499,477 est. value
Boynton Beach, FL 33436

Wawa #5365
New Construction - 7,208 SF
Post-Bid
$1,145,000 est. value
Loxahatchee Groves, FL 33470

Wawa # 5348 BEN
New Construction - 11,627 SF
Construction
$943,000 est. value
West Palm Beach, FL 33411

Wawa # 5348 BEN
New Construction - 11,627 SF
Construction
$943,000 est. value
West Palm Beach, FL 33411

Amazon Fresh
Renovation - 36,000 SF
Pending Verification
Boynton Beach, FL 33426

Amazon Fresh
Build-Out - 35,000 SF
Pending Verification
Boca Raton, FL 33428

Wawa
New Construction - 5,636 SF
Conception
$1,200,000 est. value
West Palm Beach, FL 33407

7-Eleven # 34967
New Construction - 3,500 SF
Design
$2,500,000 est. value
Lake Worth, FL 33463

Wawa # 5403
New Construction, Demolition - 6,119 SF
Post-Bid
$1,800,000 est. value
West Palm Beach, FL 33407

Catalina at Lake Worth
New Construction - 506,000 SF
Construction
$52,500,000 est. value
Greenacres, FL 33467

Reported 05/19/2022 10:48 AM
Project Title

Murphy Express #8919

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33422   (Palm Beach County)
Category(s) Commercial
Sub-Category(s) Gas Station, Supermarket/Convenience Store
Contracting Method Bids by Invitation.
Project Status Construction Documents, Bidding Expected July 2022, Construction Start Expected October 2022, Construction Completion Expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Gas Station, 1 Story Above Grade, Approximately 2,800 SF New Construction, 8 Fuel Pump(s), Supermarket/Convenience Store.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents