Similar Projects
ENR and ENG Remodel - University of South Florida
Renovation
Conception
$11,894,029 CJ est. value
Tampa, FL 33620

Addition/Remodel Bio-Science Facility Research Labs (BSF) - University of South Florida
Build-out
Conception
$18,762,975 CJ est. value
Tampa, FL 33620

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

East 7th Avenue Retail Addition and Renovation
Addition, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Tampa, FL 33605

Specialty Treatment Expansion (Minor) Construction - Tampa
Addition, Demolition, Infrastructure - 14,000 SF
Bidding
$20,000,000 CJ est. value
Tampa, FL 33612

E/W Green Spine Cycle Track - PH 3B from 7th Avenue to 13th Avenue and E/W Green Spine Cycle Track - PH 3C from 13th Avenue to 21st Avenue - Rebid
Infrastructure
Bidding
$2,013,000 CJ est. value
Tampa, FL 33602

RFQ D/B - North B St to Himes Ave CIAC - Phase 5
Infrastructure
Post-Bid
$22,500,000 CJ est. value
Tampa, FL 33602

Northwest Wastewater Plant Operations Building - C10303000 - Hillsborough County
New Construction, Infrastructure
Post-Bid
$11,250,000 CJ est. value
Tampa, FL 33602

West Burke Street Gravity Main Replacement
Infrastructure
Results
$1,068,334 CJ est. value
Tampa, FL 33614

W. Cleveland Street at Rome Avenue Traffic Signal - FDOT LAP Rebid
Infrastructure
Results
$844,622 CJ est. value
Tampa, FL 33606

Gas Worx - Phase 1
New Construction, Infrastructure - 20,000 SF
Construction
$500,000,000 CJ est. value
Tampa, FL 33605

Epicurean Hotel Expansion
Demolition, New Construction, Infrastructure
Construction
$21,000,000 CJ est. value
Tampa, FL 33602

Local Tampa
New Construction, Infrastructure - 14,000 SF
Pending Verification
$88,300,000 CJ est. value
Tampa, FL 33606

North 17th Street Multifamily Development
New Construction, Infrastructure - 79,250 SF
Pending Verification
$22,000,000 CJ est. value
Tampa, FL 33605

Cross Creek Park Construction - C80005000 - Hillsborough County
New Construction, Infrastructure
Conception
$1,854,000 CJ est. value
Tampa Palms, FL 33647

Last Updated 10/10/2023 03:40 PM
Project Title

University of South Florida On Campus Stadium Project

Physical Address View project details and contacts
City, State (County) Tampa, FL 33602   (Hillsborough County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) College/University, Site Development, Stadium
Contracting Method Competitive Bids
Project Status Construction start expected October 2024 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $400,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope includes but is not limited to site work and construction of a new stadium at University of South Florida. As of October 10, 2023, the project is in final planning & design stage. The general contractor anticipates subcontract bidding opportunities late summer 2024. Construction is anticipated to begin October 2024.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents