Similar Projects
Drainage Repairs - Phase 1 - BDL
Infrastructure
Bidding
Windsor Locks, CT

Trench Restoration 2021
Post-Bid
Southington, CT

Exterior Lighting Upgrade and Site Improvements at Elms Village Apartments
Alteration
Post-Bid
East Hartford, CT

Brook Street Retaining Wall Replacement
Results
Bristol, CT

Springside Avenue Drainage Outfall Replacement
Results
East Hartford, CT 06108

Drainage Improvements - 2021 Mill and Pave Project
Infrastructure
Post-Bid
Suffield, CT

Pequabuck River Conduit - Culvert Rehabilitation
Results
Bristol, CT 06010

Detention Pond Inspection and Cleaning
Infrastructure
Post-Bid
Southington, CT

Flood Control System Main Street Levee Closure Structure Repairs
Results
Hartford, CT

Thompsonville Road/Cassotta Lane SSES Pipeline Rehabilitation
Infrastructure
Post-Bid
Suffield, CT 06078

2021 Storm Drainage Installation and Repair
Term Contract
Results
West Hartford, CT

Roadway Reconstruction/ Storm Drainage and Miscellaneous Work at Various Locations
Results
Bristol, CT

Retaining Wall Replacement at Memorial Boulevard
Infrastructure
Results
Bristol, CT

Storm Drainage and Sidewalk Ramp Rehabilitation
Infrastructure
Results
Glastonbury, CT 06033

Installation of Hydrodynamic Separator at Pine Lake
Infrastructure
Results
Bristol, CT

Reported 03/03/2022 12:00 AM
Project Title

Silver Creek East Branch Channel Restoration Project

Physical Address View project details and contacts
City, State (County) Bristol, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The general location of the project is within the Silver Creek stream channel beginning on the Mt. Hope High School campus continuing upstream to approximately 136 feet northwest of the cul- de-sac of Leila Jean Drive and approximately 1,000 feet north of the intersection of Leila Jean Drive and Chestnut Street. The work addressed by this contract includes but is not limited to, creating and erecting two signs that identify the RIDEM application number for the project; mobilization; preparation of staging and access areas; coordination with the Town on the removal of steel storage containers (Conex-type boxes) from high school staging area; limited vegetation pruning along channel banks and for machinery access; installation, re-installation, and removal of turbidity curtain( per plan); installation and removal of compost filter sock; installation and removal of temporary construction mats as conditions may warrant; removal of logs and other obstructions from river channel; removal and lawful disposal of accumulated sediment from river channel; handling, stockpiling, transporting, and lawfully disposing of any removed sediment determined by Beta Group to be contaminated; and installation of stone check dam in existing storm water swale/basin. The Work also includes loaming and seeding lawn areas and restoring driveways disturbed by construction activities; site cleaning; demobilization; and all incidentals required to complete the work of this contract to the satisfaction of the Town of Bristol. The Town has obtained landowner authorization and will notify all landowners of the selected Bidder and scheduled date of mobilization. Work will occur in residential yards and on the High School property, so limits of disturbance and access routes must be strictly adhered to.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents