Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Road Maintenance and Repair
Design
Blacksburg, Covington, Edinburg, Harrisonburg, Marion, Natural Bridge Station, Wise, VA

Midtown - DC 5 Mixed-Use Building
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Blacksburg, VA 24060

RFP Construction Manager at Risk - Prequalification of Construction Managers at Risk (CM at Risk) for the New Business Building
New Construction, Infrastructure
Bidding
$670,000 CJ est. value
Blacksburg, VA 24060

RFP - Construction Engineering and Inspection (CEI) Services
Term Contract
Bidding
Christiansburg, VA 24073

Bridge Cleaning (Primary System)
Post-Bid
Less than $504,000 est. value

Governor's Quad Pavers
Post-Bid
Radford, VA 24141

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

2021 Surface Treatment
Results
Less than $387,000 est. value

Draper Road Streetscape
Infrastructure
Conception
$5,040,500 CJ est. value
Blacksburg, VA 24060

Roanoke Street Sewer Shed Upgrades - Town Of Blacksburg
Infrastructure
Design
$528,695 CJ est. value
Blacksburg, VA 24060

RFP - Water, Sewer, and Wastewater Treatment Term Services
Term Contract
Bidding
Christiansburg, VA 24073

Transit Maintenance Services
Infrastructure
Post-Bid
Blacksburg, VA

2021 Plant Mix
Results
Less than $3,583,000 est. value

Last Updated 08/12/2022 12:31 PM
Project Title

Harding Avenue Stormwater and Pedestrian Project- Town of Blacksburg

Physical Address View project details and contacts
City, State (County) Blacksburg, VA 24060   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,489,012 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UPDATE : https://www.blacksburg.gov/home/showpublisheddocument/10986/637939047421330000 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project provides funding to correct serious drainage problems in the right-of-way that include, but are not limited to, culvert replacement, storm water pipe extension, pipe size upgrades, pipe repair, inlet installation, ditch installation, and manhole replacement. Harding Avenue has been identified as a priority for pedestrian improvement. This project combines stormwater improvements with needed pedestrian and bicycle enhancements.Funding in FY2020 through FY2022 was maintained at an appropriate level to address the preliminary engineering, design and right of way acquisition and construction for this project. VDOT revenue sharing funding has been approved for 50% of the construction costs. The preliminary study is complete and 30% plans have been designed. At this stage the engineers' estimate for construction appears to be more than the preliminary construction budget. An additional $750,000 in funding for FY2023 is being requested to maintain the project scope and complete construction by Spring 2023 As of August 12, 2022, project is included Town of Blacksburg FY 2023-2027 CIP *The previous solicitation is listed below for reference. --- The Town of Blacksburg is soliciting proposals from qualified civil engineering firms for the surveying, construction plan development, and right of way acquisition for the Harding Avenue sidewalk from 1300 Harding Road to Patrick Henry Drive. Also included in the design are provisions for curb and gutter, storm drainage and stormwater management from 1300 Harding to Apartment Heights Drive.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents