Similar Projects
Marine Operations Building – Floodwall Project
Post-Bid
Lewes, DE 19958

Shallcross Drainage Project
Post-Bid
Middletown, DE 19709

BR 2-050A on SR8 Halltown Road over Beaverdam Ditch
Results
Less than $1,389,000 est. value
DE

SR141 Advance Utility Relocation Under Southbound I-95
Results
Less than $696,214 est. value
DE

Delaware Coast, Bethany Beach to South Bethany, Delaware Sussex County, DE
Post-Bid
$5,000,000 to $10,000,000 est. value
Bethany Beach, DE

Artificial Reef Project Contractor
Term Contract
Results
Westover Hills, DE

Sherwood Forest Stream Restoration
Results
Arden, DE

BR 3-935 on S211 Mccoy Street over Herring Branch
Results
$498,362 est. value
DE

The Mill Race Drainage Improvements
Results
Rockland, DE

Cleaning of Feeder Ditches at the Southern Solid Waste Management Center
Results
Georgetown, DE 19947

Clearing, Grubbing and Fencing at the Central Solid Waste Management Center
Results
Felton, DE 19943

Reinforced Concrete Pipe
Term Contract
Results

Elsmere -1201 Sycamore Avenue Drainage Improvement
Results
Less than $234,150 est. value
Elsmere, DE 19805

Beachfill-Rohoboth DE
Results
Less than $10,000,000 est. value
Rehoboth, DE 19971

Simonds Gardens Site Drainage Improvements
Results
Newark, DE 19702

Last Updated 10/23/2019 01:59 PM
Project Title

BR 3-588 on SR26 Nine Foot Road over Wharton'S Branch

Physical Address View project details and contacts
City, State (County) DE   (Sussex County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $888,940
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Consist of furnishing all labor and materials for the replacement of Bridge 3-588 on SR26 Nine Foot Road over Wharton's Branch. This work includes removing the existing two corrugated aluminum pipes and replacing them with a precast concrete box culvert and wingwalls.additional work includes reconstruction of the approach roadway, installation of guardrail, and placement of riprap in the stream forscour protection. Work will be performed under a full road closure with detour for vehicular traffic, and other incidental construction in accordance with the location, notes and details shown on the plans and as directed by the Engineer.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents