Similar Projects
Tempe Campus Central Utility Plant
New Construction
Conception
Tempe, AZ 85281

Vistancia Pump Station Conversion - Zone 5/6 To Zone 6/7
Post-Bid
Scottsdale, AZ 85383

Recoat Discharge Tubes at Mark Wilmer Pumping Plant
Renovation
Post-Bid
Phoenix, AZ

Design-Build Services For Waddell Pumping Plant Plc-5 Replacement Project
Results
Less than $3,150,000 est. value
Phoenix, AZ

Luke Air Force Base Lift Station Construction Manager at Risk Services
Results
$3,000,000 est. value
Glendale, AZ 85301

Vistancia Boulevard - Sewer Lift Station I-1
Construction
Peoria, AZ 85383

Storm Water Pump Lift
Term Contract
Post-Bid
Phoenix, AZ 85012

Riley Drive Wastewater Lift Station
Results
Avondale, AZ 85323

Construction Manager at Risk Well Head Treatment Project-Well 7 Project
Alteration
Post-Bid
$7,000,000 est. value
Tempe, AZ

Booster Pump Station Improvements - Construction Manager at Risk
Results
Phoenix, AZ 85003

Lift Station 2 Upgrades (67th Avenue and ACDC)
Renovation, Infrastructure
Post-Bid
$3,500,000 est. value
Peoria, AZ 85381

Jomax Booster Station Upgrades & Terramar Booster Pump Station Rehabilitation - CMAR
Results
Peoria, AZ 85345

4540--644-Storm Water Lift Station Repair
Term Contract
Post-Bid
Phoenix, AZ 85012

Rehabilitation of Pump Station
Results
Less than $2,400,000 est. value
Mesa, AZ 85200

Deer Valley Water Treatment Plant Finished Water Pump Station and Chemical Facility Rehabilitation and Refurbishment Construction Manager at Risk Services
Renovation
Post-Bid
$30,000,000 est. value
Phoenix, AZ

Last Updated 12/03/2021 11:07 PM
Project Title

Construction Manager at Risk Booster Pump Station 83A/B Rehabilitation

Physical Address View project details and contacts
City, State (County) Scottsdale, AZ 85258   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,500,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of booster pump station 83 A/B, including but not limited to demolition, installation, piping, metering, pumps, air compressors, hydropneumatic tanks, backup generator, electrical and site improvements.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents