Similar Projects
Timber Sales State Game Lands No 254
Post-Bid
Buffalo, PA

Sewage Sludge Removal, Transportation and Disposal
Post-Bid
Canonsburg, PA 15317

Soil Disposal at 35 LUKOIL Stations in NY, NJ & PA
Term Contract
Post-Bid

Collection of Refuse in the Borough of New Eagle
Post-Bid
New Eagle, PA

Solid Waste Removal
Post-Bid
Washington, PA 15301

Collection and Disposal of Unlimited Residential Solid Waste Materials
Post-Bid
Fredericktown, PA 15333

Municipal Waste Collection and Disposal
Post-Bid
Ellsworth, PA 15331

Trash Removal and Recycling Services
Post-Bid
California, PA

WTP Sludge Disposal
Results
Fredericktown, PA 15333

Residential Solid Waste Collection and Disposal
Term Contract
Post-Bid
Burgettstown, PA 15021

Residential Municipal Waste Collection, Transportation and Disposal
Post-Bid
Coal Center, PA 15423

South Franklin Township Property Timber Removal
Post-Bid
Washington, PA

Soil Disposal at 35 LUKOIL Service Station
Term Contract
Post-Bid

Mixed Scrap Metal Removal and Recycling
Term Contract
Post-Bid

026000001 Lumber
Post-Bid
Less than $150,000 est. value
Washington, PA

Reported 04/08/2020 12:00 AM
Project Title

Refuse Washington, PA

Physical Address View project details and contacts
City, State (County) Washington, PA 15301   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The U. S. Army Contracting Command - New Jersey is issuing this Sources Sought Notice/Request for Information (RFI) in an effort to perform market research to assist in determining the appropriate acquisition strategy for Refuse services to be performed at the Washington USARC, 10 Scenic Drive Washington, PA 15301. The Government intends to award a single firm-fixed-price contract as a result of the future solicitation to be issued. The expected period of performance is one 12-month base period and four 12-month option periods. The contractor shall provide all personnel, supplies, supervision, tools, materials, equipment, transportation, fuel and other items and non-personal services necessary to provide refuse collection and recycling services in accordance with this Performance Work Statement (PWS) except as those items specified as government furnished property and services. The contractor shall perform to the standards in the contract as well as all local, state and federal regulations. The contractor shall perform to the standards in the contract as well as all local, state and federal regulations. Attached is a DRAFT Performance Work Statement for planning purposes only. No solicitation documents exist at this time. Issuance of this notice does not constitute any obligation on the part of the Government to procure these services or to issue a solicitation. In addition, the Government is Refuse services in Washington, PA under no obligation to pay for information submitted in response to this notice and responses to this notice cannot be accepted as offers. Submittal Requirements. Please provide the following in your response to this RFI:

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents