Similar Projects
Bulk Construction Materials
Term Contract
Design
Camp Lejeune, NC 28547

Structure RTAFC Repairs MCB Camp Lejeune
Build-out
Bidding
$25,000,000 CJ est. value
Jacksonville, NC 28540

Women's Bathroom Building 1771
Renovation
Bidding
$250,000 CJ est. value
Jacksonville, NC 28540

North Carolina MATOC for General and Design/Build Construction
Term Contract
Post-Bid
$250,000,000 CJ est. value
Apex, NC 27523

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Repair BEQ BB255
Renovation
Results
$5,000,000 to $10,000,000 est. value
Camp Lejeune, NC 28547

LCH4025 and M303 Facility Repairs
Renovation
Results
$25,000 to $100,000 est. value
Camp Lejeune, NC

Y--Q1218 - SOF Marine Battalion Company/Team Facilities & Q1393 SOF Survival Evasion Resistance Escape Training
Construction
$10,000,000 est. value
Camp Lejeune, NC

Structure RTAFC MOUT Repairs
Renovation
Bidding
$25,000,000 CJ est. value
Camp Lejeune, NC 28547

Repair BEQ HP115
Renovation
Post-Bid
$10,000,000 est. value
Camp Lejeune, NC 28547

Repair BEQ FC530
Renovation
Post-Bid
$10,000,000 CJ est. value
Camp Lejeune, NC 28547

RFQ D/B - P1458 2nd Radio Battalion Complex Phase 2
New Construction, Infrastructure
Post-Bid
$46,400,000 CJ est. value
Camp Lejeune, NC 28547

Building 236 Pool Paint
Renovation
Post-Bid
$100,000 CJ est. value
Jacksonville, NC 28547

Replacement of Stairwell Building 12
Renovation, Infrastructure
Post-Bid
$100,000 CJ est. value
Camp Lejeune, NC 28547

Replace Floor Trusses BA96
Renovation
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Last Updated 06/28/2023 02:33 AM
Project Title

Mechanical Repairs for WC145 Camp Lejeune

Physical Address View project details and contacts
City, State (County) Camp Lejeune, NC 28547   (Onslow County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

NAVFAC Solicitation No.: N40085-23-R-2725 Title: Mechanical Repairs for WC145, Marine Corps Base (MCB), Camp Lejeune, North Carolina Description of the Work: The work includes replacement of the existing HVAC system for WC145. The existing system is a geothermal/water source with heat pumps. New system will be 4-pipe units. Project will include a new mechanical building for WC145 and incidental related work. Estimated Cost Range: More than $10,000,000 Time for Completion: Contract completion date is 720 calendar days. The days are calculated from date of task order award, which includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance, bonding and other requirements set forth in the task order/MACC. Task order award is considered notice to proceed. Wage Determination: Department of Labor (DoL) General Decision Number NC20230038 04/21/2023 applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated at the time of award. Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall not be charged to the Contractor. The Contractor shall carefully conserve the use of any utilities furnished by the government. Record Drawings: In accordance with FAR 52.236-21, Specifications and Drawings for Construction, record drawings are required. Reproducible copies of these record drawings are required. Government Furnished Property: Not Included. Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less. Performance and Payment Bonds are required for the task order within ten (10) calendar days of construction effort award. Bonds are not required for the preconstruction services. Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $880.00 for each calendar day of delay until the work is completed or accepted. Basis for Award: Lowest Price Proposal Requirement: Provide proposal on the enclosed Pricing Sheet. Proposal Acceptance Period: Proposal acceptance period shall be 60 days from receipt of offers. Requests for Information (RFIs): RFI's must be submitted to kyle.l.vaughan2.civ@us.navy.mil. The cut off for RFIs is 29 May 2023 2:00 PM EST in order to process all inquiries by the proposal due date. A response will be published via an amendment to https://www.sam.gov/. Site Visit: Yes, will be scheduled via amendment. Special Requirements: Contractor may only perform work in one half of the building at one time. The other half of the building will remain occupied without any outages.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents