Similar Projects
Bada Bean Cawfee
Build-Out
Conception
Menlo Park, NJ 08837

Popeyes and Burger King
New Construction, Demolition
Conception
Edison, NJ

Monroe Equities Retail & Restaurant
New Construction - 6,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Monroe Township, NJ

Auxiliary Gym Addition at Cranbury School
Addition
Bidding
Cranbury, NJ 08512

Easton Avenue Mixed-Use Building
New Construction - 1,600 SF
Sub-Bidding
$5,000,000 to $6,000,000 est. value
New Brunswick, NJ 08901

Popeyes
Renovation - 2,311 SF
Post-Bid
Woodbridge, NJ 07095

Stair Upgrades at Carteret High School, Carteret Middle School, Columbus Elementary School and Nathan Hale Elementary Schools
Post-Bid
Carteret, NJ 07008

Classroom Alterations and Auditorium Upgrades at Multiple Schools
Renovation
Results
$4,729,000 est. value
Piscataway, NJ 08854

Nurse`s Restroom Renovations at Menlo Park Terrace School
Renovation
Results
Metuchen, NJ 08840

Classroom Addition Fire Escape Replacement at Lincoln Elementary School
Addition
Construction
$2,678,000 est. value
Edison, NJ 08817

Route 9 Shopping Center
New Construction - 385,270 SF
Pending Verification
Old Bridge, NJ 08857

Dunkin Donuts
New Construction
Conception
Edison, NJ 08820

Insomnia Cookies
Renovation - 1,080 SF
Post-Bid
New Brunswick, NJ 08901

Disaster Recovery Services
Results

El Jefe
Renovation - 2,070 SF
Post-Bid
New Brunswick, NJ 08901

Last Updated 12/02/2021 01:11 PM
Project Title

Addition and Alteration to the Lafayette Estates School 25

Physical Address View project details and contacts
City, State (County) Fords, NJ 08863   (Middlesex County)
Category(s) Commercial, Education, Entertainment/Recreation
Sub-Category(s) Elementary School, Fitness Center, Food/Beverage Service
Contracting Method
Project Status Construction Commenced November 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the construction of a new one-story, 18 classroom addition, with cafeteria and gymnasium; The project scope includes, but is not limited to, a. The construction of a new one story addition ; The addition will contain new general classrooms, cafeteria and gymnasium, and will include new plumbing, electrical, fire sprinkler and HVAC work b. Conversion of the existing cafeteria into a STEM lab c. Expansion of the existing asphalt parking. d. Safety, security, and air quality upgrades.

Details

36,434 SF - Elementary School, Approximately 36,434 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Audio-Visual Equipment, Athletic Equipment, Exercise Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Institutional Furniture, Classroom Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents