Similar Projects
Roof Replacement at Centennial Hall and Grasso Hall WCSU Westside Campus
Bidding
Danbury, CT 06810

Ferrara Elementary Portable Classroom Roof Replacement
Bidding
East Haven, CT 06513

Reroofing at Birchwood Terrace
Post-Bid
Danielson, CT 06239

Design-Build Services for Roof Replacement at Anamet Property
Post-Bid
Waterbury, CT

Norwalk Roof and HVAC Department of Motor Vehicles Branch Office Facility
Results
$831,343 to $875,097 est. value
Norwalk, CT 06851

Flanders Elementary School Roof Replacement
Results
Less than $866,345 est. value
East Lyme, CT 06333

Sage Park Middle School Roof Replacement
Bidding
Windsor, CT 06095

Siding And Roof Sealing
Post-Bid
Stamford, CT 06901

Partial Roof Replacement at Southington High School
Results
Southington, CT 06489

Nunnawauk Meadows - Roofing
Post-Bid
Newtown, CT 06470

Partial Roofing Replacement at Ben Franklin Community Center - Phase 2
Results
Less than $300,000 est. value
Norwalk, CT 06854

Roof Improvements at Wolfe
Post-Bid
New Haven, CT

Roof Replacement at Andover Public Works Facility
Results
Less than $53,000 est. value
Andover, CT 06232

Roof Replacements at Spring Heights Apartments
Post-Bid
$300,000 to $500,000 est. value
West Haven, CT 06516

Partial Roof Replacement Tolland Middle School
Results
Less than $2,295,000 est. value
Tolland, CT 06084

Reported 12/05/2019 12:00 AM
Project Title

Town Hall Upper Flat Roof Repairs

Physical Address View project details and contacts
City, State (County) Clinton, CT 06413   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove existing roof system down to substrate. a. Any substrate to be repaired/replaced as needed. Associated costs to be determined prior to work being done once type of material is determined. 2. Install a self-adhering vapor barrier over prepared substrate 3. Furnish and install tapered insulation to provide positive drainage to the roof system. 4. Install NEW bitumen roofing system over new insulation. 5. All rooftop equipment and penetrations (i.e. Drains, wall flashing, etc.) will follow manufacturer’s specifications. 6. Fabricate and install two (2) thru-wall scuppers and make repairs to one new leader head. 7. Complete clean-up and breakdown of equipment leaving area surrounds as found. 8. Provide any and all written warranties

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents