Similar Projects
Camp Highland Bridge Replacement - 2-212 - City of Smyrna
New Construction
Conception
$1,500,000 est. value
Smyrna, GA 30082

SR 101 at Euharlee Creek Trib in Rockmart
New Construction
Design
$4,000,000 est. value
Rockmart, GA 30153

Cedar Grove Road Bridge over Norfolk Southern Railway (NS)
New Construction, Infrastructure
Bidding
$260,000 est. value
Decatur, GA 30030

Bridge Rehabilitation for Walton Way
Renovation, Infrastructure
Bidding
$700,000 est. value
Augusta, GA 30903

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

I-285 Eastside Bridges Replacements
Results
GA

On-Call Bridge Design Services
Term Contract
Results
Atlanta, GA

Construction of a Bridge and Approaches
New Construction, Infrastructure
Bidding
$5,000,000 est. value
Atlanta, GA 30329

T32-D1-Bridge-I-85/SR 403 Jackson-126275
New Construction, Infrastructure
Post-Bid
GA

Bridge Repairs
Results
Watkinsville, GA 30677

Bridge Rehabilitation
Renovation, Infrastructure
Bidding
$3,000,000 est. value
Atlanta, GA

Comprehensive Maintenance Services - District 5
New Construction, Infrastructure
Post-Bid

Retrofitting an Existing Railroad Trestle Bridge with a Concrete Deck for the Covington Cricketfrog Trail
Results
Covington, GA

Bridge Rehabilitation
Renovation, Infrastructure
Bidding
$3,000,000 est. value

Reported 06/28/2022 09:40 AM
Project Title

Tolleson Park Trail Bridges - City of Smyrna

Physical Address View project details and contacts
City, State (County) Smyrna, GA 30080   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will fund the replacement of two bridges on the walking trails at Tolleson Park. The bridges are of wood construction and are deteriorating, creating a safety issue. The project is included in the City of Smyrna's FY 2023-2027 Capital Improvement Program (CIP). As of June 27, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents