Similar Projects
Wyngate Boulevard Paving Reconstruction Project
Infrastructure
Bidding
$1,300,000 est. value
Plano, TX 75086

Downtown Inner Loop Improvements Phase 1
Infrastructure
Bidding
$7,500,000 est. value
Celina, TX

Trinity Falls Planning Unit 7 Phase 1 Paving and Utilities Bid Package
Post-Bid
McKinney, TX 76063

Flexible Pavement Mill and Overlay
Post-Bid
Less than $481,273 est. value
TX

Southern Region Disaster Recovery Support BPA
Results

Fishtrap Road and Teel Parkway Intersection Improvements and Traffic Signal
Results
$286,225 est. value
Prosper, TX 75078

Meadow Hill Drive Reconstruction
Infrastructure
Bidding
$3,500,000 to $4,200,000 est. value
Frisco, TX 75034

Preston Ridge - Fire Lane Addition
Post-Bid
Frisco, TX 75035

Reconstruction CR 317, 318, 324, 325
Results
$1,931,933 est. value
McKinney, TX 75071

Arterial Concrete Pavement Maintenance Requirements Contract 2021 Project
Infrastructure
Bidding
Plano, TX

Paving Improvements for Inspiration, Phase 8A
Post-Bid
TX

Main Replacements & Street Rehab (Northwood Park/Westwood Park Area)
Results
Frisco, TX 75069

Phase 4A/4C - Bridgewater Paving Package
Post-Bid
TX

Civil Improvements for the Light Farms Prairie Crossing Re-Alignment
Results
$1,830,367 est. value
Celina, TX 75009

Paving Improvements to Serve Elevon, Phase 1A and 1B
Post-Bid
Lavon, TX

Last Updated 10/09/2021 03:49 AM
Project Title

SH 5 - Seal Coat

Physical Address View project details and contacts
City, State (County) TX   (Collin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,115,430
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

316 6003 Aggr (Load Haul & Distrib) Cy 1,254.000 1 316 6254 Aggr(Ty-Pl Gr-3s Sac-b) Cy 1,722.000 2 316 6255 Aggr(Ty-Pl Gr-3lw Sac-b) Cy 28,033.000 3 316 6434 Aggr (Ty-Pb Gr-4 Or Ty-Pl Gr-4 ( Sac-b) Cy 5,578.000 4 316 6454 Asph (Ac-15p,Ac-20-5tr, Or Ac-20xp) Ton 6,662.260 5 354 6045 Plane Asph Conc Pav (2") Sy 49,177.000 6 500 6001 Mobilization Ls 1.000 7 502 6001 Barricades, Signs And Traffic Handling Mo 9.000 8 533 6003 Rumble Strips (Shoulder) Asphalt Lf 7,406.000 9 533 6004 Rumble Strips (Centerline) Asphalt Lf 7,156.000 10 560 6011 Mailbox Install-s (Tww-Post) Ty 4 Ea 91.000 11 560 6012 Mailbox Install-d (Tww-Post) Ty 4 Ea 2.000 12 560 6013 Mailbox Install-m (Tww-Post) Ty 4 Ea 3.000 13 658 6013 Instl Del Assm (d-Sw)Sz (Brf)Ctb Ea 252.000 14 658 6060 Remove Delin & Object Marker Assms Ea 400.000 15 658 6062 Instl Del Assm (d-Sw)Sz 1(Brf)Gf2(Bi) Ea 1,223.000 16 658 6083 Instl Del Assm (d-Sw)Sz 1(Wflx)Srf Ea 997.000 17 658 6100 Instl Om Assm (Om-2z)(Wflx)Gnd(Bi) Ea 348.000 18 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty w Ea 2,619.000 19 662 6111 Wk Zn Pav Mrk Sht Term (Tab)Ty y-2 Ea 54,584.000 20 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 29,199.000 21 666 6042 Refl Pav Mrk Ty i (w)12"(Sld)(100mil) Lf 1,759.000 22 666 6048 Refl Pav Mrk Ty i (w)24"(Sld)(100mil) Lf 8,118.000 23 666 6141 Refl Pav Mrk Ty i (y)12"(Sld)(100mil) Lf 7,908.000 24 666 6147 Refl Pav Mrk Ty i (y)24"(Sld)(100mil) Lf 1,230.000 25 666 6167 Refl Pav Mrk Ty Ii (w) 4" (Brk) Lf 13,663.000 26 666 6170 Refl Pav Mrk Ty Ii (w) 4" (Sld) Lf 2,136,694.000 27 666 6174 Refl Pav Mrk Ty Ii (w) 6" (Sld) Lf 120,494.000 28 666 6178 Refl Pav Mrk Ty Ii (w) 8" (Sld) Lf 38,058.000 29 666 6180 Refl Pav Mrk Ty Ii (w) 12" (Sld) Lf 984.000 30 666 6182 Refl Pav Mrk Ty Ii (w) 24" (Sld) Lf 8,050.000 31 666 6205 Refl Pav Mrk Ty Ii (y) 4" (Brk) Lf 152,244.000 32 666 6207 Refl Pav Mrk Ty Ii (y) 4" (Sld) Lf 1,500,574.000 33 666 6212 Refl Pav Mrk Ty Ii (y) 12" (Sld) Lf 10,647.000 34 666 6283 Ref Prof Pav Mrk Ty i(w)4"(Sld)(090mil) Lf 869,411.000 35 666 6287 Ref Prof Pav Mrk Ty i(y)4"(Sld)(090mil) Lf 589,403.000 36 666 6291 Ref Prof Pav Mrk Ty i(y)4"(Brk)(090mil) Lf 67,970.000 37 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 19,700.000 38 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 1,084,659.000 39 666 6309 Re Pm w/Ret Req Ty i (w)6"(Sld)(100mil) Lf 143,633.000 40 666 6312 Re Pm w/Ret Req Ty i (y)4"(Brk)(100mil) Lf 69,960.000 41 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 778,683.000 42 666 6441 Re Prof Pm (w)4"(Sld) Raisd Prof Only Lf 1,501,425.000 43 666 6442 Re Prof Pm (y)4"(Sld) Raisd Prof Only Lf 859,190.000 44 666 6443 Re Prof Pm (y)4"(Brk) Raisd Prof Only Lf 79,771.000 45 668 6077 Prefab Pav Mrk Ty c (w) (Arrow) Ea 123.000 46 668 6078 Prefab Pav Mrk Ty c (w) (Dbl Arrow) Ea 1.000 47 668 6085 Prefab Pav Mrk Ty c (w) (Word) Ea 97.000 48 668 6089 Prefab Pav Mrk Ty c (w) (Rr Xing) Ea 3.000 49 668 6091 Prefab Pav Mrk Ty c (w) (18")(Yld Tri) Ea 33.000 50 668 6092 Prefab Pav Mrk Ty c (w) (36")(Yld Tri) Ea 53.000 51 672 6007 Refl Pav Mrkr Ty i-c Ea 1,113.000 52 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 33,426.000 53 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 3,269.000 54 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 122,172.000 55 678 6001 Pav Surf Prep For Mrk (4") Lf 122,172.000 56 3077 6011 Sp Mixes Sp-c Pg64-22 Ton 5,411.000 57 3077 6075 Tack Coat Gal 1,967.000 58 6185 6005 Tma (Mobile Operation) Day 250.000 59

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents