Similar Projects
Last Updated | 08/22/2023 04:33 PM |
Project Title | Southeast Frisk Drive RCB Culvert for Four Mile Creek - BRG-20-001 - City of Ankeny |
Physical Address | View project details and contacts |
City, State (County) | Ankeny, IA 50021 (Polk County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development, Storage/Water Tanks |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $275,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will replace the existing bridge with a reinforced concrete box (RCB) culvert. The existing bridge is a single span 16 arch bridge constructed of concrete and timber, and it is very old. The bridge is located south of East First Street on SE Frisk Drive, spanning a tributary stream to Four Mile Creek. This project includes engineering design, construction and construction engineering services in 2024. The 2019 Iowa Structure Inventory and Appraisal conducted by Calhoun-Burns & Associates recommended replacing the bridge within the next several years due to cracks, deterioration and erosion. This project will replace the existing bridge with a reinforced concrete box (RCB) culvert. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of September 20, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available |
||||||||||||||||
Details |
|
||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |