Similar Projects
Fullerton Transportation Center ADA Improvements - 55053
Infrastructure
Conception
$1,000,000 est. value
Fullerton, CA 92832

South Aircraft Parking Ramp Pavement Rehabilitation - City of Fullerton
Alteration
Conception
Less than $2,200,000 est. value
Fullerton, CA 92833

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 CJ est. value
Orange, CA 92869

Armo Stone And Opid House Restoration And Parking Lot Improvements Pre Qual
Term Contract, Alteration
Post-Bid
$1,400,000 est. value
Orange, CA

Place RHMA-G and High Friction Surface Treatment
Infrastructure
Post-Bid
$1,570,000 est. value
CA

Maintenance Services for Operating Railroad Right-of-Way
Alteration
Results
CA

Slurry Seal for Non-Arterial Streets, Zone F
Infrastructure
Results
$1,100,000 est. value
Lake Forest, CA 92630

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Construction
$1,500,000 CJ est. value
Anaheim, CA 92801

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Construction
$1,500,000 CJ est. value
Anaheim, CA 92801

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Katella Terrace
Demolition, New Construction, Infrastructure - 10,581 SF
Design
$30,000,000 CJ est. value
Orange, CA 92867

Glen Mar Frontage Road Beautification Project
Infrastructure
Post-Bid
Huntington Beach, CA 92646

Clean and Inspect Culvert, Invert Paving and Cementitious Pipeliners
Infrastructure
Results
$690,000 est. value
CA

Last Updated 06/21/2023 03:38 AM
Project Title

Lemon Avenue & Haven Avenue to Marbella Drive Pavement Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Santa Ana, CA 92701   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $738,285 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Lemon Avenue Pavement Rehabilitation Project, from Haven Avenue to Marbella Drive The scope of work to be performed consists of, but not limited to, cold milling, weed killing, routing and crack sealing, asphalt rubber hot mix overlay, grinding and patching asphalt concrete, adjusting existing manholes and valves to new grade, rectangular rapid flashing beacon, handicap ramps, thermoplastic striping, thermoplastic white shared roadway bicycle marking, and pavement markers and striping PAYMENT BOND and Completion Bond: A Payment Bond and a Completion Bond, each in the amount of 100% of the contract amount, will be required of the Contractor The City of Rancho Cucamonga reserves the right to reject any bid or all bids and to waive any informality or irregularity in any bid

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents