Similar Projects
CT Elevator Modernization at Northern Virginia Community College
Renovation
Bidding
Annandale, VA 22003

CT Elevator Modernization at Northern Virginia Community College
Renovation
Bidding
Annandale, VA 22003

Crittenton Hall Re-Roof
Post-Bid
Norfolk, VA 23529

The L.D. Britt, MD Terrace Sculpture
Renovation
Post-Bid
$100,000 est. value
Norfolk, VA

Construction Renovations at Cafe in the Webb University Center
Renovation - 13,365 SF
Results
Norfolk, VA 23529

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Replace Roof, Hanger Building 23, NASO
Renovation, Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
Virginia Beach, VA 23460

Roofing Envelope Services
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing MACC
Post-Bid

Webb Center eSports Lab Renovation
Renovation - 2,500 SF
Results
Norfolk, VA 23529

Roofing Repair and Maintenance
Post-Bid

Starbucks at Chartway Arena Renovation
Renovation - 1,672 SF
Results
$244,400 to $450,000 est. value
Norfolk, VA

CM@Risk New Science Facility - Norfolk State University
New Construction - 128,250 SF
Post-Bid
Less than $72,000,000 est. value
Norfolk, VA 23504

Renovation of Bathrooms - Mid Rise Residential Facility
Renovation
Results
Less than $202,429 est. value
Norfolk, VA

Last Updated 11/23/2021 04:12 PM
Project Title

VBHEC Roof Replacement and Parapet Wall Repairs

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA 23453 (Norfolk City, Virginia Beach City Counties)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Roof replacement, limestone re-pointing, facade cleaning, and various exterior wall and opening repairs. Existing built-up roof shall be removed down to existing steel deck and replaced with single ply membrane type roof assembly. Existing limestone copings either replaced or covered over with metal copings. Existing limestone veneer wall joints re-pointed with sealant. Facade cleaning shall use appropriate washing methods for limestone and remaining exterior materials. Renovate existing penthouse louvers, doors, EIFS openings, flashings and sealants. Once all the roof work has been completed, the Contractor must provide a full NDL 20-year roof warranty for entire building roof area. B

Details

College/University, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents