Similar Projects
Civic Campus HVAC System Upgrade Project - Rebid
Renovation
Design
$80,000 CJ est. value
Pacific, WA 98047

Library HVAC Replacement
Renovation
Sub-Bidding
$800,000 CJ est. value
Tacoma, WA 98405

HVAC, Air Systems & MERV Filters
Term Contract
Sub-Bidding
Kent, WA 98032

Angel of the Winds Arena Chiller Replacement
Alteration
Post-Bid
$600,000 est. value
Everett, WA 98213

Repair of Emergency Boiler
Term Contract, Alteration
Post-Bid
$100,000 to $250,000 est. value
Tacoma, WA 98431

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

Maintenance Building HVAC Replacement
Alteration
Results
$895,000 est. value
Richland, WA 99352

HVAC Replacement Rooftop Heat Pump and A/C Units
Renovation
Construction
$132,868 CJ est. value
Renton, WA 98057

South Shore K-8 Chiller Replacement
Renovation
Construction
$225,350 CJ est. value
Seattle, WA 98118

AML HVAC Unit (4 EA) Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Richland, WA 99354

HVAC Quarterly Inspection, Maintenance and Small Repairs
Alteration
Post-Bid
Edmonds, WA 98020

WCCW MSU Building Climate Control Improvements
Alteration
Results
$860,000 to $1,010,000 est. value
Gig Harbor, WA 98332

Hazen High School - Domestic Water Entrance and Water Heater Upgrades
Renovation
Construction
$255,137 CJ est. value
Renton, WA 98059

Replacement of All Roof Top Units, 2 Mini Splits, and New HVAC Automated Controls System, Tie All Exhaust Fans to Controls.
Renovation
Sub-Bidding
$500,000 CJ est. value
Coulee Dam, WA 99116

WWTP HVAC Equipment Removal and Replacement
Alteration
Post-Bid
Mount Vernon, WA

Last Updated 06/30/2023 09:16 AM
Project Title

Water Heater Replacement At Stevens Court Apartments

Physical Address View project details and contacts
City, State (County) Olympia, WA 98501   (Thurston County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $55,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope includes disconnecting existing water tanks, removing and recycling off campus and installing new standard electric water heaters, matching the current or largest available capacity to match the existing water heater installation The work will take place summer 2023 through no later than december 29, 2023. Installation plan and schedule can be determined following award with mutual agreement of both parties. There is one gas water heater (the 91 gallon unit). Most of the installations will be in occupied units but there is a chance a few will be vacant. Inquiry due date: 5/26/23 12:00 P.M. After registering, notify the UW Buyer (Graham Sherwood grams@uw.edu ) that you would like to view and potentially respond to this event and reference this project. The Buyer will then send you an invitation to join the sourcing event. If you do not email the Buyer, you will not be invited to the sourcing event. Feel free to confirm with Graham Sherwood at (206) 685-9074 or via email.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents