Similar Projects
2023/24 Traffic Signal Program (S Duff Ave / Chestnut St)
Infrastructure
Bidding
$490,000 CJ est. value
Ames, IA 50010

PCC Pavement - Replace
Infrastructure
Bidding
$1,000,000 CJ est. value
Hancock, IA 51536

Electric Vehicle Charging Station Installation
Term Contract
Post-Bid
Less than $25,000 est. value
Ames, IA 50010

Concrete Vaults
Alteration
Post-Bid
Ames, IA

Radio Tower Concrete Pads
Alteration
Results
Sac City, IA

Pocahontas County Drainage District No. 56 Main 2 Tile Improvements
Alteration
Results
$530,000 est. value
Rolfe, IA

Idaho Drive Electric Distribution Conversion
Infrastructure
Bidding
$720,000 CJ est. value
Pella, IA 50219

Sterile Processing Services Addition and NFS Dock Renovations project at the VA Central Iowa Health Care System
Addition, Demolition, Renovation, Infrastructure - 13,955 SF
Post-Bid
$20,000,000 CJ est. value
Des Moines, IA 50310

Animal Control Facility Bid Package No. 4 - Concrete Building Foundations and Slab on Grade
Renovation, Alteration - 21,900 SF
Results
$535,000 est. value
Des Moines, IA 50317

Centerville Academic Building - Architectural Precast Concrete Panels
Alteration
Post-Bid
Centerville, IA 52544

Midamerican Energy Company Recplex - Resurfacer Room Slab Replacement
Alteration
Results
West Des Moines, IA 50266

Mystique Ice Rink Concrete Subfloor Project
Renovation, Alteration
Post-Bid
$60,000 est. value
Dubuque, IA 52001

Lake Ahquabi State Park Spillway Joint Repairs
Alteration
Results
Indianola, IA 50125

Concrete Repairs at Athletics Locations
Alteration
Post-Bid
Ames, IA

Concrete Street Rehabilitation - 14th Avenue North and 15th Avenue South Project
Infrastructure
Results
$512,683 est. value
Clinton, IA 52732

Last Updated 05/09/2023 03:20 PM
Project Title

Scrip Road Conversion Project

Physical Address View project details and contacts
City, State (County) Mason City, IA 50401   (Cerro Gordo County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $430,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement Removal/Scarification, HMA Paving, Miscellaneous Landscaping, Erosion Control and Turf Restoration Est. Completion Date:Aug. 15, 2023 The Project includes all labor, materials, and equipment necessary for removing the existing overlay on Scrip Road (Birch Drive), excavating to proper grade and paving the new trail adjacent to the Winnebago River, as well as asphalt paving of a parking lot area and miscellaneous site work such as gates, bollards and other restoration work The established DBE goal for this project is 0% of the total amount bid. The bid security must not contain any conditions either in body or as an endorsement thereon. The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into contract within ten (10) days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and the other contract documents. The City will accept bid bond forms that meet the requirements of Iowa Code section 26.8. Bidders shall not be permitted to withdraw their bids for a period of forty-five (45) days after the same are opened

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents