Similar Projects
Lealman Heights Redevelopment
New Construction
Conception
Saint Petersburg, FL 33714

Alta Belleair Apartments
New Construction - 456,125 SF
Design
$45,000,000 est. value
Largo, FL 33756

770 Apartments
New Construction
Design
$3,000,000 est. value
Saint Petersburg, FL 33701

Holiday Isle Resort
New Construction - 78,691 SF
Post-Bid
$15,000,000 est. value
Madeira Beach, FL 33708

Grand Villa of St Petersburg
New Construction - 168,435 SF
Post-Bid
Saint Petersburg, FL 33712

Development of Residential Property - Lealman Community Redevelopment Area
Results
Clearwater, FL 33756

Development of the South Washington Avenue Site
Results
Clearwater, FL 33756

334 Saint Pete Residences
New Construction - 428,702 SF
Construction
$48,233,750 est. value
Saint Petersburg, FL

The Shores
New Construction
Construction
Saint Petersburg, FL 33712

Washington Avenue Apartments
New Construction
Pending Verification
$38,000,000 est. value
Clearwater, FL 33756

Avalon Apartments
New Construction
Pending Verification
Largo, FL 33778

Orange Station at the Edge
New Construction, Build-Out, Demolition - 122,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Saint Petersburg, FL 33701

Marina Bay Condominium
New Construction - 38,361 SF
Post-Bid
Clearwater, FL 33755

Tropicana Field Redevelopment
Results
Saint Petersburg, FL

Avalon Beach Club Condo Hotel
New Construction
Construction
Clearwater Beach, FL 33767

Last Updated 02/04/2022 11:20 AM
Project Title

Jamestown Apartments Renovations, Phase 3-G, Sheltered

Physical Address View project details and contacts
City, State (County) Saint Petersburg, FL 33705   (Pinellas County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of eight units, including, but not limited to: selective interior demolition; interior finishes; electrical fixtures and upgrades; plumbing fixtures and upgrades; mechanical heating, ventilation, and air conditioning (HVAC) system cleaning and minor upgrades; removal and replacement of existing doors and window. Renovation of existing Maintenance Building No. 2, including, but not limited to: removal and replacement of existing asphalt shingle roofing; removal and replacement of existing exterior stucco system; installation of new impact rated door, including necessary framing modifications; cleaning and exterior painting

Details

Apartments/Condominiums, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents