Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Slabjacking and Subsealing Services
Infrastructure
Results

2021 City Street Rehabilitation
Infrastructure
Results
$1,100,000 est. value
Hugo, OK

Pavement Rehabilitation (Asphalt) Indian Nation Turnpike
Infrastructure
Results

Resurface (Asphalt) US-70
Infrastructure
Results
OK

Resurface (Asphalt) US-70
Infrastructure
Results
OK

Resurface (Asphalt) US-70
Infrastructure
Results

Reconstruction (No Added Lanes) County Road (NS-412/Main Street)
Infrastructure
Results
$4,383,016 est. value
Soper, OK

Bridge and Approaches - SH 109
Infrastructure
Design
$2,750,100 CJ est. value
Hugo, OK 74743

Bridge and Approaches - SH 109
Infrastructure
Design
$2,750,100 CJ est. value
Hugo, OK 74743

Bridge and Approaches - US 271
Infrastructure
Design
$12,616,998 CJ est. value
Hugo, OK 74743

Bridge and Approaches - US 271
Infrastructure
Design
$12,616,998 CJ est. value
Hugo, OK 74743

Asphalt Overlay
Infrastructure
Bidding
$726,000 CJ est. value
Hugo, OK 74743

Asphalt Overlay
Infrastructure
Bidding
$726,000 CJ est. value
Hugo, OK 74743

Asphalt Overlay
Infrastructure
Bidding
$726,000 CJ est. value
Hugo, OK 74743

Last Updated 08/10/2022 07:03 PM
Project Title

Cable Barrier, Traffic Signing and Striping - Indian Nation Turnpike

Physical Address View project details and contacts
City, State (County) Hugo, OK 74743   (Choctaw County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Steel
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $10,956,220 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Cable Barrier, Traffic Signing and Striping Indian Nation Turnpike: From Mile Post 0.00 to Mile Post 16.00, Between Hugo and Antlers. Project Length = 15.837 Miles Counties: Choctaw, Pushmataha Submit Any Questions or Concerns to the Office Engineer Division via: - Email: Odot-prebid.question@odot.org - Phone: (405) 521 - 2625 Each Bid Shall Be Accompanied by a Certified or Cashier's Check or Bid Bond Equal to 5% of the Bid Made Payable to the State of Oklahoma, Department of Transportation, as a Proposal Guaranty. Proposal Checks Will Be Held or Returned by the Department as Per Subsection 103.04 of the State Standard Specifications. OK DOT- Call Order 033 - Cable Barrier, Traffic Signing and Striping - Indian Nation Turnpike

Details

Division 10 - Specialties, Signage, Traffic Signage.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment, Transportation Construction and Equipment, Roadway Construction, Vehicle Barriers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents