Similar Projects
Training Building New 3-Bay Substation - HVAC Construction Work
Alteration
Bidding
Central Islip, NY 11722

225kW Induction Cogeneration System - Yaphank Jail New Section
Alteration
Bidding
Yaphank, NY 11980

HVAC Duct Cleaning and Mold Remediation and Abatement Services
Term Contract
Post-Bid
Stony Brook, NY

Green Heating and Cooling East Hampton Town Campaign
Alteration
Post-Bid
East Hampton, NY

Remove, Supply and Install Two Inverters/Heat Pumps at USCB STA Fire Island
Term Contract
Results
$25,000 est. value
Babylon, NY 11702

Building Automation System Repairs (Hvac)
Alteration
Results
$250,000 to $500,000 est. value
Shoreham, NY 11786

Water Dynamic Corp Storage Building
New Construction, Renovation - 2,291 SF
Pending Verification
Less than $500,000 CJ est. value
Southold, NY 11971

75 Kw Induction Cogeneration System - Riverhead Jail
Alteration
Bidding
Riverhead, NY 11901

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Installation of (AOP) Water Treatment Systems at Mckay Road and Hollywood Place
New Construction
Results
Huntington, Huntington Station, NY 11746

150 KW Induction Cogeneration System - Riverhead Jail Maximum Security
Alteration
Bidding
Riverhead, NY 11901

HVAC Service and New Installations
Term Contract
Post-Bid
Yaphank, NY

Combination of Bond Phase 2,3 and 4 - HVAC
Alteration
Results
Bohemia, Ronkonkoma, NY 11716

HVAC and Mechanical Upgrades at Millennium Hills
Alteration
Bidding
Melville, NY

Remove, Supply and Install Three Inverters/Heat Pumps
Term Contract
Post-Bid
Babylon, NY 11702

Last Updated 04/19/2022 12:19 PM
Project Title

Cooling Tower Maintenance and Water Treatment

Physical Address View project details and contacts
City, State (County) Stony Brook, NY   (Suffolk County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) HVAC, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide Cooling Tower Water Treatment Program for a five year period for Campus Residences and Stony Brook University Hospital. The service is to include periodic inspections, testing, cleaning, disinfection and treatment of the cooling towers. Contract term five (5) years commencing upon March 15, 2022 through March 14, 2027.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents