Similar Projects
Westside Water Reclamation In-Plant Pump Station and Headworks - Design-Build
Design
$18,000,000 to $20,000,000 est. value
Daytona Beach, FL

Racetrack Water Tower Booster Pump Station
New Construction
Bidding
Homestead, FL 33035

Utilities Pump Station Improvements Package 24
Bidding
$2,160,127 est. value
Belle Isle, Orlando, FL 32812

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Construction of Lift Station 1 Relocation
New Construction
Post-Bid
Maitland, FL

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Water Booster Station #1
Results
Gretna, FL

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Englewood Sports Complex Irrigation Improvements
New Construction, Alteration
Bidding
$375,264 est. value
Englewood, FL 34223

Deep Injection Well Pump Station Coating
New Construction
Post-Bid
North Port, FL 34287

Master Lift Station X8
New Construction
Results
Immokalee, FL 34142

Cedar Bay District II Pump Stations and Flow Rerouting Project - Robena Road
Construction
Jacksonville, FL 32218

Bayshore Yacht Basin Relocation and Force Main Replacement
New Construction
Bidding
$3,092,000 est. value
Bradenton, FL 34207

RIVERTOWN PARCEL 1 "Public Utilities" JEA Lift Station, Reclaimed Main and Sewer Improvements
New Construction
Post-Bid
Jacksonville, FL

Last Updated 04/08/2022 09:58 AM
Project Title

Wastewater Lift Station Preventative Maintenance and Repair Services

Physical Address View project details and contacts
City, State (County) Sanibel, FL   (Lee County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide lift station preventative maintenance, lift station repair services, and general utility maintenance on an as needed bases as determined by the City.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents