Similar Projects
FPL Orange Blossom Solar Energy Center
New Construction
Design
Vero Beach, FL 32968

Combined Cycle Facility
New Construction
Design
$727,000,000 est. value
Palatka, FL

Unit 5 SCR Catalyst Replacement at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33801

Unit 5 Hot Reheat (HRH) ByPass Valve Replacement at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

Bag and Cage Replacement for Deerhaven 2
Results
Less than $556,075 est. value
Gainesville, FL 32653

Unit #5 Combustion Turbine Inlet Filter Cartrige Replacements
Results
Lakeland, FL 33801

HCA Davie Hospital and Medical Center
New Construction - 905,330 SF
Construction
$220,000,000 est. value
Davie, FL 33328

300+ Mega-Watt Solar Farm
New Construction
Pending Verification
Daytona Beach, FL

Discovery Solar Energy Center
New Construction
Design
$100,000,000 est. value
Merritt Island, FL 329953

Central Energy Plant, (UF Main Campus)
Post-Bid
Less than $200,025,548 est. value
Gainesville, FL 326115

Kennedy Generation Station Control Room Construction Project
Results
Jacksonville, FL 32206

Solar Plant
New Construction
Design
$150,000,000 est. value
Crystal River, FL

Combustion Turbines HMI Upgrade Project
Results
Jacksonville, FL 32226

FPL Grove Solar Energy Center
New Construction
Design
Vero Beach, FL 32966

Reported 09/09/2020 12:00 AM
Project Title

Unit 3 Ball Mill Lifters Replacement at McIntosh Power Plant

Physical Address View project details and contacts
City, State (County) Lakeland, FL 33805   (Polk County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Power Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors to supply materials and labor to replace the unit 3 ball mill lifters and plates located at: 3030 East Lake Parker Drive, Lakeland, FL. The contractor shall provide without limitation, all labor, materials, equipment, and supervision to perform the work scope

Details

Division 11 - Equipment, Other Equipment.
Division 40 - Process Integration.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents