Similar Projects
Florida State University Football Stadium
Renovation
Conception
Tallahassee, FL 32304

BIT Building Classroom Remodels
Renovation
Conception
$11,035,743 est. value
Tallahassee, FL 32304

FSU Sandels Building Basement Renovations
Renovation
Bidding
Tallahassee, FL 32304

Student's Performing Amphitheatre Audio Video Improvements
Renovation
Sub-Bidding
Tallahassee, FL 32307

Payroll Services Renovation
Renovation
Sub-Bidding
Tallahassee, FL

Engineering Building
New Construction
Post-Bid
$60,000,000 est. value

Construction Manager for Florida State University, Window Replacement and Exterior Envelope Repairs Longmire Building
Post-Bid
Tallahassee, FL

Construction Managers
Results
Tallahassee, FL

Continuing Services Contract to Provide Minor Construction Management (CM) Services
Renovation
Results
Less than $200,000 est. value

FSUS Steam Hardening & Building
Construction
Less than $17,000,000 est. value
Tallahassee, FL

Sliger 0804 Data Center Renovation
Renovation
Construction
Tallahassee, FL

Central Utility Plant Renovation
Renovation
Conception
$10,913,099 est. value
Tallahassee, FL 32304

Bragg Memorial Stadium Repairs Phase 1
Demolition
Post-Bid
Tallahassee, FL 32307

Public-Private Partnership (P3) to Construct and Operate a Research Facility
New Construction - 30,000 SF
Results
Lakeland, FL 33868

FAMU New Student Services Dining Facility
- 14,362 SF
Construction
$10,869,230 est. value
Tallahassee, FL

Reported 02/24/2022 12:00 AM
Project Title

Doak Campbell Stadium Improvements

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32304   (Leon County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) College/University, Stadium
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $20,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the planning, design, and construction of improvements to Doak Campbell Stadium on FSU’s main campus and be completed in phases and coordinated with all stadium activities. Improvements include; Stadium infrastructure, structural, life safety, code, and related repairs required to bring the stadium into compliance. The areas of work will be determined by the availability of funds and schedule to maximize improvements.

Details

College/University, Renovation, Stadium, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents