Similar Projects
Bridge 00002 Repair by Replacement
Design
$1,000,000 to $2,000,000 est. value
Fort McCoy, WI

Elm Drive Br Turtle Creek Bridge, B-53-0388
New Construction, Infrastructure
Bidding
WI

CTH WG, Bridge Over Dutch Gap Canal, P-30-0900
New Construction
Bidding
WI

Rehabilitation of the West Cherry Street Bascule Bridge Over the Milwaukee River
Post-Bid
Milwaukee, WI 53202

2021 Colley Road and Stateline Road Bridge Deck Sealing
New Construction, Infrastructure
Post-Bid
Beloit, WI 53511

Corporate Drive Bridge Replacement
Renovation
Results
Brookfield, WI 53005

C20-03 Broad Street Bridge Deck Repair
Results
Beloit, WI 53511

T. McKinley, 270th Avenue, Clam River Bridge, B-48-0054
New Construction, Infrastructure
Bidding
WI

Bridge Deck Rehabilitation
New Construction
Post-Bid
Kenosha, WI

Rocky Run Snowmobile Bridge Replacement
Results
Portage, WI 53901

T. Wascott, Lawler Bridge Road, Eau Claire River Bridge, B-16-0146
New Construction, Infrastructure
Bidding
WI

CTH N Over Sugar Grove Creek Bridge Replacement
New Construction, Infrastructure
Post-Bid
Franklin, Freedom, WI

State Street Lift Bridge - Balancing
Results
$100,000 to $300,000 est. value
Racine, WI 53403

Knapp - Downing, Wilson Creek Bridge, B-17-0232
New Construction, Infrastructure
Bidding
Downing, Knapp, WI

Bridge Replacement Construction
New Construction, Infrastructure
Post-Bid
Junction City, WI 54443

Last Updated 11/01/2021 04:39 PM
Project Title

2021 Bridge Maintenance

Physical Address View project details and contacts
City, State (County) Fond du Lac, WI   (Fond du Lac County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. 200 SY Clearing Brush and Trees 2. 2550 SY Polymer Surface Overlay 3. 120 SF Concrete Surface Repair 4. 2 EA Steel Railing Special and Concrete Staining 5. 60 CY Riprap

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents