Similar Projects
Reported | 02/26/2021 12:00 AM |
Project Title | Sidewalk Trip Hazard Assessment and Grinding |
Physical Address | View project details and contacts |
City, State (County) | Rocky Mount, NC (Edgecombe County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall remove concrete tripping hazards from sidewalks, wheelchair ramps and concrete curbing at locations authorized by the City. The identified hazard will be repaired through horizontal saw cutting of concrete surfaces. Contractor should provide a letter verifying documented licensure of sidewalk trip hazard mitigation which directly relates to horizontal cutting and removing of trip hazards on public walkways complying with ADA Standard Regulation. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |