Similar Projects
Village at Hays Reserve Apartment Complex
New Construction
Design
$60,000,000 est. value
Huntsville, AL 35810

Oak Meadows
New Construction, Infrastructure
Design
Huntsville, AL 35810

South Pointe Connector Gas Main Extension Project
Infrastructure
Bidding
$1,500,000 CJ est. value
Huntsville, AL 35801

Stillwater Force Main Phase 1
Infrastructure
Bidding
$400,000 CJ est. value
Madison, AL 35758

Boardwalk at Research Park
New Construction - 320,943 SF
Post-Bid
$10,000,000 CJ est. value
Huntsville, AL 35806

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Horizontal and Directional Bores for Madison County Water
Results
$147,000 est. value
Huntsville, AL 35811

Redstone Gateway Phase III
Infrastructure
Results
Huntsville, AL

Stoneridge Villas - Phase 2
New Construction
Construction
$9,500,000 est. value
Madison, AL 35757

Ariza Oakwood
New Construction - 3,413,229 SF
Construction
$10,000,000 CJ est. value
Huntsville, AL 35806

Manor On County Line Apartments
New Construction
Pending Verification
Huntsville, AL

Slaughter Road Special Care Assisted Living Facility
Demolition, New Construction, Infrastructure - 32,000 SF
Pending Verification
$8,500,000 CJ est. value
Madison, AL 35758

Paxton Place Apartments
New Construction, Infrastructure
Design
$125,000,000 CJ est. value
Huntsville, AL 35801

Wood Springs Suite / Huntsville
New Construction, Infrastructure
Bidding
Huntsville, AL 35805

Kroger U-606 / Madison
Demolition, Infrastructure, Build-out, Renovation - 89,892 SF
Post-Bid
$2,500,000 CJ est. value
Madison, AL 35758

Last Updated 10/27/2022 11:15 AM
Project Title

Livano Town Madison

Physical Address View project details and contacts
City, State (County) Madison, AL 35758   (Madison County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $119,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 27, 2022 construction is underway. Construction started in September 2022. Bids for subcontractors are mostly complete and awarded.

Details

4 Stories Above Grade, 422,545 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents