Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

North System North Trunk (NSNT) Sewer Siphon Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Chino, CA 91710

Starbucks / San Bernardino
New Construction, Infrastructure - 1,001 SF
Bidding
$750,000 CJ est. value
Highland, CA 92346

Construction of Simulation Center
New Construction, Infrastructure - 70,000 SF
Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Replace Pcc and Ac Pavement With Jpcp and Hma Pavement
Infrastructure
Results
CA

Saw Cutting, Asphalt Repair/Replacement, Slurry, and Paving
Infrastructure
Results
Yucaipa, CA 92399

Rathbun Creek Trailhead Restroom and Parking Lot - City of Big Bear Lake
Infrastructure
Conception
$660,000 est. value
Big Bear Lake, CA

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

Runway 26R ILS Upgrade Project at Ontario Internatonal Airport
Infrastructure
Bidding
$3,250,000 CJ est. value
Ontario, CA 91761

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Seventh Avenue Arrowhead Drive Road Improvement
Alteration
Results
Victorville, CA

Last Updated 08/10/2022 02:02 PM
Project Title

Localized Asphalt Patch and Pothole Repairs at Schaefer Avenue

Physical Address View project details and contacts
City, State (County) Chino, CA 91710   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $607,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work may include but not be limited to the following: furnish all labor, materials and equipment to: Remove existing pavement section to 2" below current top of pavement and construct 2" AC pavement. Minimum width to be 4'. Spot grinding as determined in the field by City Representative Project Type Bid Response Types Line Items Type of Award Lump Sum License Requirements Class A or C-12 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Bid Valid 120 Liquidated Damages 500 Start/Delivery Date Start Date: September 2022; End Date: 45 working days Project Duration Forty-Five (45) Working Days Online Q&A Yes Q&A Deadline 07/05/2022 10:00 AM (PDT)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents