Similar Projects
Last Updated | 05/04/2023 02:05 PM |
Project Title | CBCSD Kirn Track Improvements - Rebid |
Physical Address | View project details and contacts |
City, State (County) | Council Bluffs, IA 51501 (Pottawattamie County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $250,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1 bid received, over budget, rejected per owner Track Improvements - 1. Removal of Existing Pavement 4,142 SY 2. Removal of Existing Base 690 CY 3. Scarify and Recompact Subgrade, 9" 4,153 SY 4. Geogrid 2,000 SY 5. Select Backfill 500 CY 6. 6" Modified Subbase 710 CY 7. Hot Mix Asphalt, Base Course, 3/4 " Mix 575 TN 8. Hot Mix Asphalt, Base Course 1/2 " Mix 385 TN 9. 4" Perforated Subdrain 1,245 LF 10. Connect Subdrain to Storm Structure 10 EA 11. 1/2 " Track Surfacing 3,530 SY 12. Track Paint Markings 1 LS 13. 6" PCC Sidewalk 269 SY 14. 6" Concrete Pad 130 SY 15. Modify Storm Sewer Structure 9 EA 16. Remove Existing Structure 1 EA 17. Area Inlet, SW-512 1 EA 18. Concrete Pad for Storm Sewer Structures 220 SF 19. Erosion Control 1 LS 20. Seeding 1 LS Inquiries shall be submitted to Lincoln Rodenburg, P.E., HGM Associates Inc., 640 Fifth Avenue, Council Bluffs, Iowa 51501. All pertinent answers or interpretations (before opening of bids) shall be made by the Engineer's Addendum to all bidders not later than two (2) days before the bid date. The final completion date for this project is April 1, 2024 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |